Permit: DP19-0214

Parcel: 132131280


Addresses:

3434 S KINO PW


Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Permit Number - DP19-0214

Inspection Description - ENGR Engineering Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final Not Ready
10/27/2022 ENGR Engineering Final Not Ready
10/11/2023 ENGR Engineering Final Not Ready Called Rick engineering # (520) 795-1000 spoke to Vanessa she said she would get me in touch with Janak he called me back (586) 601-4102 this permit was pulled by Borderland construction. it was a general address for the Martin Luther King boulevard extension plat A sections 1 2 and 3, I will review with Dave Roberts.
10/11/2023 ENGR Engineering Final Not Ready Called Rick engineering # (520) 795-1000 spoke to Vanessa she said she would get me in touch with Janak he called me back (586) 601-4102 this permit was pulled by Borderland construction. it was a general address for the Martin Luther King boulevard extension plat A sections 1 2 and 3, I will review with Dave Roberts.
10/18/2023 ENGR Engineering Final Partial Pass Monument on East side of Martin Luther King Jr. is completed and in place and landscape is completed, the Monument on the West side of Martin Luther King Jr. has footer and monument base completed and landscape around concrete base is not complete.

The sidewalks and landscape for this section are about 90 % completed.

Need to verify detail (27) on page 2 and 3 and handicap ramp and railing on West side of MLK Jr.
10/18/2023 ENGR Engineering Final Partial Pass Monument on East side of Martin Luther King Jr. is completed and in place and landscape is completed, the Monument on the West side of Martin Luther King Jr. has footer and monument base completed and landscape around concrete base is not complete.

The sidewalks and landscape for this section are about 90 % completed.

Need to verify detail (27) on page 2 and 3 and handicap ramp and railing on West side of MLK Jr.