Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Site/Engineering Division - NPPO
Permit Number - DP19-0214
Inspection Description - PDSD Site/Engineering Division - NPPO
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | PDSD Site/Engineering Division - NPPO | Not Ready | ||
10/11/2023 | PDSD Site/Engineering Division - NPPO | Not Ready | Called Rick engineering # (520) 795-1000 spoke to Vanessa she said she would get me in touch with Janak he called me back (586) 601-4102 this permit was pulled by Borderland construction. it was a general address for the Martin Luther King boulevard extension plat A sections 1 2 and 3, I will review with Dave Roberts. | |
10/18/2023 | PDSD Site/Engineering Division - NPPO | Partial Pass | Monument on East side of Martin Luther King Jr. is completed and in place and landscape is completed, the Monument on the West side of Martin Luther King Jr. has footer and monument base completed and landscape around concrete base is not complete. The sidewalks and landscape for this section are about 90 % completed. Need to verify detail (27) on page 2 and 3 and handicap ramp and railing on West side of MLK Jr. |