Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP19-0198
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/21/2021 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
12/21/2021 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
12/21/2021 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
02/22/2021 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by VLEON1 - PARTIAL FOR 445 W SPEEDWAY BL AT THIS TIME, LOOKED AT THE HANDRAIL BEING INSTALLED IN THE PARKING LOT AT 4 LOCATIONS. THE CONTRACTOR HAS THE TOP RAIL INSTALLED AT ALL LOCATIONS BUT DOES NOT HAVE THE KICK PLATE INSTALLED AT THIS TIME. THEY WILL COMPLETE THIS INSTALLATION AND WILL THEN CALL IN FOR THE FINAL INSPECTION. |
02/18/2021 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by RSALDAT1 - PARTIAL, HANDRAIL POST HAVE BEEN POURED TODAY AT FOUR RAMP LOCATIONS ON THIS SITE. THEY WILL CONTINUE BUILDING THE HANDRAIL |
02/16/2021 | ENGR Grading Final | DROBERTS | Not ready for Inspection | Entered by VLEON1 - THE CONTRACTOR IS WORKING ON THE DIGGING OF THE FOUNDATION HOLES FOR THE HANDRAIL POST. I LOOKED AT THE SITE AND THE CREW HAS ONLY ONE POST HOLE DRILLED THROUGH THE PAVEMENT AT THIS TIME, THEY ARE HAVING ISSUES WITH THE CORING MACHINE. I HAVE ASKED THEIR OFFICE TO CONTACT ME WHEN THE HOLES HAVE BEEN COMPLETED, BUT HAVE REMINDED THEM THAT I WILL BE OFF TOMORROW. THEY WILL ADVISE ME WHETHER THEY WILL BE COMPLETING THE CONCRETE POURING ON EITHER THURSDAY OR FRIDAY. |
12/03/2020 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by PAHUMAD1 - PARTIAL, I MET WITH THE CONTRACTOR AND DISCUSSED THE FUTURE WORK TO TAKE PLACE. 1) I ADVISED HIM THAT THE HANDICAP PARKING, ACCESS AISLES, AND PATHWAYS HAVE TO BE ADA COMPLIANT. 2) THE TRASH ENCLOSURE NEEDS TO HAVE THE DOORS INSTALLED, APPROACH COMPLETED, CURBS REMOVED, AND THE PAVEMENTS NEEDS TO BE INSTALLED. 3) ALL PARKING NEEDS TO BE COMPLETED AS SHOWN ON THE APPROVED PLANS. 4) PROVIDE BICYCLE PARKING AS SHOWN ON THE APPROVED PLANS. 5) ALL CHANGES MADE TO THE SITE NEED TO BE REFLECTED ON THE REVISED DRAWINGS THAT WILL BE UTILIZED DURING THE FINAL INSPECTION. |
12/21/2021 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
09/03/2020 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by JSCHNEI2 - PARTIAL AT THIS TIME, FINAL NOT TO BE GIVEN TILL THE WALLS HAVE BEEN COMETED AND GROUTED. THE FIRST 4 FEET WERE CHWCKED AND APPROVED FOR GROUT BY 4:00, THE REMAING PORTION OF THE WALL WILL BE COMPLETED ON 9/4/2020 ALONG WITH THE FINAL INSPECTION. |
06/22/2020 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by DROBERT5 - THE CONTRACTOR WILL BE WORKING ON THE INSTALLATION OF THE REMAINING REBAR |
06/22/2020 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by DROBERT5 - THE CONTRACTOR CONTACTED ME AND ASKED ME TOO STOP BY AND LOOK AT THEIR LAYOUT FOR THE NEW TRASH ENCLOSURE. I HAVE PROVIDED THEM WITH THE DETAIL SHEETS FOR OUR TRASH ENCLOSURES AND HAVE ASKED THAT THEY MAKE THE NECESSARY CORRECTIONS FOR THE REBAR PLACEMENT IN THE FOOTER AND THE VERTICALS FOR THE WALLS. I WILL RESCHEDULE THIS INSPECTION FOR TOMORRW MORNING TO VERIFY THAT ALL THE REQUIRED WORK IS COMPLETED. THE LIST OF CORRECTIONS ARE AS FOLLOWS 1) MISSING A CONTINOUS #3 REBAR IN THE LOWER PORTION OF THE FOOTER. 2) VERTICAL UPRIGHT BARS ARE NOT THE RIGHT TYPE , THESE WILL BE EXCHANGED WHEN THE BAR IS PLACED IN THE FOOTER. 3) MISSING ADDITIONAL VERTICAL BARS IN THE CORNERS AND AT THE ENDS OF THE WALL. 4) PLACE BLOCKS THROUGHOUT THE AREA UNDERNEATH THE REBAR FLOOR MAT TO SUPPORT IT SO IT DOES NOT COME INTO COTACT WITH THE DIRT DURING THE PLACEMENT OF THE CONCRETE. |
06/23/2020 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by DROBERT5 - I MET ON SITE WITH THE CONTRACTOR TO VERIFY THAT THEY HAD MADE THE CORRECTIONS FROM YESTERDAYS INSPECTION, EVERYTHING IS OK AT THIS TIME FOR THE POURING OF THE FOOTER AND THE FLOOR SLAB. |