Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP19-0191
Inspection Description - ENGR Grading Final
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/09/2020 | ENGR Grading Final | RLEDONNE | Approved | Entered by DMERANZ1 - |
| 03/04/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by SFLORES2 - Continue. OK for first left on trashing closure. |
| 02/14/2020 | ENGR Grading Final | DROBERTS | Continued | Entered by SFLORES2 - IS CONTINUED AT THIS TIME, OK TO POUR FOOTER FOR THE TRASH ENCLOSURE |
| 02/13/2020 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Concrete contractor did not show up. |
| 06/30/2020 | ENGR Grading Final | RLEDONNE | Approved | Entered by RSALDAT1 - Approved. |
| 07/08/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
| 07/08/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by RSALDAT1 - IS APPROVED |
| 07/06/2020 | ENGR Grading Final | DROBERTS | Not ready for Inspection | Entered by RSALDAT1 - |
| 07/01/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Walk site with Dave Roberts Ryan and Craig. Went over work to be completed for finals. |
| 06/30/2020 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by RSALDAT1 - Not ready.ADA parking and drop off zone over 2%. Ramp leading to street over 2% need to add handrails to ramp. Complete bicycle parking. Complete all work on approved plan. |
| 06/16/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Walk site with GC went over work to finish for finals checked water harvesting areas. |
| 05/27/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Walked site with concrete contractor and general contractor Ryan. Went over ramps on site and sidewalks. Any change to approve plans provide COTApproved revisions. |
| 05/08/2020 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - IS CONTINUED AT THIS TIME. THE CREWS ARE WORKING ON MAKING GRADE THROUGHOUT THIS SITE AND FORMING FOR SIDEWALKS. THEY ARE MAKING SOME MINOR CHANGES TO THE SIDEWALK AT THE SOUTH EAST CORNER OF THE SITE, THEIR RECOMMENDATIONS APPEAR TO BE ACCEPTABLE AND WILL BE SUBMITTED FOR APPROVAL DURING THEIR REVISIONS FOR THE SITE. I HAVE ASKED THE SUPERINTENDENT TO ADVISE THE ENGINEER OF RECORD TO SEND ME A PDF OF THE CHANGE SO THAT I CAN FORWARD IT TO THE ZONING AND ENGINEERING REVIEWERS. |
| 08/24/2021 | ENGR Grading Final | BBENEDON | Approved | Entered by RSALDAT1 - Continued. Expired permit, brake max. All finals were approved. |
| 06/16/2020 | ENGR Grading Final | RLEDONNE | Approved | Entered by RSALDAT1 - |
| 05/08/2020 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - |