Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Setup and Controls
Permit Number - DP19-0186
Inspection Description - SITE - Stormwater Setup and Controls
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | SITE - Stormwater Setup and Controls | Not Ready | ||
10/03/2023 | SITE - Stormwater Setup and Controls | Not Ready | Coyote pass no access thru gate contacts and notes show limited info. | |
10/25/2023 | SITE - Stormwater Setup and Controls | Not Ready | No access thru gate will review with Dave Robert’s. | |
10/31/2023 | SITE - Stormwater Setup and Controls | Passed |