Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 07/31/2020 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by RSALDAT1 - . Approved |
| 07/20/2020 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by RSALDAT1 - Partially approved. Engineer and has no issues it would provide a temporary certificate of occupancy.
|
| 07/31/2020 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by RSALDAT1 - . Approved |
| 07/22/2020 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready. Remove excess dirt from water harvesting areas shown on page 8 of civil drawings. Provide minimum of 6 inches of clear space below the inlet of each basin. Install rip rap as specified. |
| 07/20/2020 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready. Complete accessible signs, complete grading at water harvesting basins prior to starting landscaping. Install bicycle parking. Check slope of accessible parking and access. |