Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP19-0184
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2020 | ENGR Engineering Final | BBENEDON | Approved | Entered by RSALDAT1 - . Approved |
| 07/20/2020 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Engineer and has no issues it would provide a temporary certificate of occupancy. |
| 07/31/2020 | ENGR Engineering Final | BBENEDON | Approved | Entered by RSALDAT1 - . Approved |
| 07/22/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready. Remove excess dirt from water harvesting areas shown on page 8 of civil drawings. Provide minimum of 6 inches of clear space below the inlet of each basin. Install rip rap as specified. |
| 07/20/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready. Complete accessible signs, complete grading at water harvesting basins prior to starting landscaping. Install bicycle parking. Check slope of accessible parking and access. |