Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 07/31/2020 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Approved |
Entered by RSALDAT1 - . Approved |
| 07/20/2020 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready. Complete accessible signs, complete grading at water harvesting basins prior to starting landscaping. Install bicycle parking. Check slope of accessible parking and access. |
| 08/04/2020 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Approved |
Entered by RSALDAT1 - Approved |
| 07/30/2020 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Continued |
Entered by JSCHNEI2 - Continued. Complete ground coverings remove nursery stakes and cut down exterior sewer clean out.
|
| 07/22/2020 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready. Remove excess dirt from water harvesting areas shown on page 8 of civil drawings. Provide minimum of 6 inches of clear space below the inlet of each basin. Install rip rap as specified. |