Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP19-0178
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
02/23/2022 | ENGR Grading Final | Complete (Recurring) | {Activity date: 02/23/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN/ FORMING FOR SIDEWALK . 3300 S PARK AV} ; {Activity date: 02/23/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN/ FORMING FOR SIDEWALK . 3250 S PARK AV} ; {Activity date: 02/23/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN/ FORMING FOR SIDEWALK 3010 S PARK AV} ; {Activity date: 02/22/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 01/27/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET ONSITE WITH THE CONTRACTOR TO DISCUSS WHAT THEIR OPERATION WILL BE FOR THE SITE OVER THE NEXT FEW MONTHS. THEY WILL BE WORKING ON THE SOUTHSIDE OF THE PROJECT INSTALL ALL OF THE CURBS, MAKING ROADWAY GRADES, AND THEN PAVING THE ROADWAYS.} ; {Activity date: 01/21/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - CONTINUED AT THIS TIME. THE CONTRACTOR IS CURRENTLY WORKING ON CURB INSTALLATION THROUGHOUT THE SOUTHERN PORTION OF THIS SITE. ALSO THEY WILL BE COMPLETING THE UTILITY INSTALLATIONS AND CUTTING THE STREET SUB-GRADES. 3010 S PARK AV} ; {Activity date: 01/21/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - CONTINUED AT THIS TIME. THE CONTRACTOR IS CURRENTLY WORKING ON CURB INSTALLATION THROUGHOUT THE SOUTHERN PORTION OF THIS SITE. ALSO THEY WILL BE COMPLETING THE UTILITY INSTALLATIONS AND CUTTING THE STREET SUB-GRADES. 3250 S PARK AV} ; {Activity date: 01/21/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - CONTINUED AT THIS TIME. THE CONTRACTOR IS CURRENTLY WORKING ON CURB INSTALLATION THROUGHOUT THE SOUTHERN PORTION OF THIS SITE. ALSO THEY WILL BE COMPLETING THE UTILITY INSTALLATIONS AND CUTTING THE STREET SUB-GRADES. 3300 S PARK AV} ; {Activity date: 01/19/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 12/17/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. No contact information provided. Borderland 3010 S PARK AV} ; {Activity date: 12/17/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Not ready. There is no contact information or message provided for this inspection. Please reschedule inspection and provide necessary information for Inspector to complete inspection. 3250 S PARK AV} ; {Activity date: 12/17/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Not ready. There is no contact information or message provided for this inspection. Please reschedule inspection and provide necessary information for Inspector to complete inspection. 3300 S PARK AV } ; {Activity date: 12/15/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 07/30/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED AT THIS TIME CONTRACTOR IS WORKING ON INSTALLING 24" RCP AT 2 DIFFERENT LOCATIONS. THE FIRST LOCATION IS APPROXIMATELY 125 FEET WEST OF PARK AVE AND 25 TO 125 FEET SOUTH OF THE SPINE ROAD, APPROXIMATELY 100' FEET OF 24" RCP PARTIAL ON INSTALL AND BACKFIL TO SPRING LINE. THE 2ND LOCATION IS APPROXIMATELY 150 TO 200 FEET SOUTH OF THE SPINE ROAD EAST OF THE SCHOOL. THIS PIPE WAS APPROVED FOR THE PKACEMENT OF BACKFILL TO FINISH GRADE. THE LIWER PORTION OF THIS WORK WAS INSPECTED BY MARTUN HERNANDEZ ON 7/29/21.} ; {Activity date: 07/30/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED AT THIS TIME CONTRACTOR IS WORKING ON INSTALLING 24" RCP AT 2 DIFFERENT LOCATIONS. THE FIRST LOCATION IS APPROXIMATELY 125 FEET WEST OF PARK AVE AND 25 TO 125 FEET SOUTH OF THE SPINE ROAD, APPROXIMATELY 100' FEET OF 24" RCP PARTIAL ON INSTALL AND BACKFIL TO SPRING LINE. THE 2ND LOCATION IS APPROXIMATELY 150 TO 200 FEET SOUTH OF THE SPINE ROAD EAST OF THE SCHOOL. THIS PIPE WAS APPROVED FOR THE PKACEMENT OF BACKFILL TO FINISH GRADE. THE LIWER PORTION OF THIS WORK WAS INSPECTED BY MARTUN HERNANDEZ ON 7/29/21.} ; {Activity date: 07/30/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - GRADING INTERMEDIATE OS CONTINUED AT THIS TIME CONTRACTOR IS WORKING ON INSTALLING 24" RCP AT 2 DIFFERENT LOCATIONS. THE FIRST LOCATION IS APPROXIMATELY 125 FEET WEST OF PARK AVE AND 25 TO 125 FEET SOUTH OF THE SPINE ROAD, APPROXIMATELY 100' FEET OF 24" RCP PARTIAL ON INSTALL AND BACKFIL TO SPRING LINE. THE 2ND LOCATION IS APPROXIMATELY 150 TO 200 FEET SOUTH OF THE SPINE ROAD EAST OF THE SCHOOL. THIS PIPE WAS APPROVED FOR THE PKACEMENT OF BACKFILL TO FINISH GRADE. THE LIWER PORTION OF THIS WORK WAS INSPECTED BY MARTUN HERNANDEZ ON 7/29/21. } ; {Activity date: 05/27/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE FOR 3300 S PARK AV} ; {Activity date: 01/15/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - FOR 3300 S PARK AVE - ONTINUED, CREWS ARE INSTALLING 2 SECTIONS HDPE ON THE NORTH SIDE OF THE ROADWAY WEST OF THE FIRST ROAD CROSSING WEST OF PARK} ; {Activity date: 01/15/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - FOR 3250 S PARK AVE - CONTINUED, CREWS ARE INSTALLING 2 SECTIONS HDPE ON THE NORTH SIDE OF THE ROADWAY WEST OF THE FIRST ROAD CROSSING WEST OF PARK} ; {Activity date: 01/15/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - FOR 3010 S PARK AV - CONTINUED, CREWS ARE INSTALLING 2 SECTIONS HDPE ON THE NORTH SIDE OF THE ROADWAY WEST OF THE FIRST ROAD CROSSING WEST OF PARK} ; {Activity date: 01/11/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - FOR 3300 S PARK AVE - CN GOOD} ; {Activity date: 01/11/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - FOR 3250 S PARK AV - CN GOOD} ; {Activity date: 01/11/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - FOR 3010 S PARK AV - CN GOOD} ; {Activity date: 01/08/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - FOR 3010 S PARK AVE - CONTINUED AT THIS TIME, THE CREW IS EXCAVATING FOR THE PLACEMENT OF REINFORCED CONCRETE PIPE IN THE 2ND ENTRANCE WEST OF PARK AVENUE SOUTH OF TUCSON MARKET PLACE. THEY HAVE PREVIOUSLY PLACED HDPE PIPE 20 EAST OF THIS LOCATION TO THE EAST TOWARDS PARK AVE, THIS PIPE MAY NOT HAVE BEEN INSPECTED AND MAY NEED A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD IF WE DID NOT INSPECT. I ADVISED KEVIN HOW TO CALL IN ALL FUTURE INSPECTIONS TO MAKE SURE ALL INSPECTIONS ARE PERFORMED AS REQUESTED.} ; {Activity date: 01/08/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - FOR 3250 S PARK AV - CONTINUED AT THIS TIME, THE CREW IS EXCAVATING FOR THE PLACEMENT OF REINFORCED CONCRETE PIPE IN THE 2ND ENTRANCE WEST OF PARK AVENUE SOUTH OF TUCSON MARKET PLACE. THEY HAVE PREVIOUSLY PLACED HDPE PIPE 20 EAST OF THIS LOCATION TO THE EAST TOWARDS PARK AVE, THIS PIPE MAY NOT HAVE BEEN INSPECTED AND MAY NEED A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD IF WE DID NOT INSPECT. I ADVISED KEVIN HOW TO CALL IN ALL FUTURE INSPECTIONS TO MAKE SURE ALL INSPECTIONS ARE PERFORMED AS REQUESTED.} ; {Activity date: 01/08/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED AT THIS TIME, THE CREW IS EXCAVATING FOR THE PLACEMENT OF REINFORCED CONCRETE PIPE IN THE 2ND ENTRANCE WEST OF PARK AVENUE SOUTH OF TUCSON MARKET PLACE. THEY HAVE PREVIOUSLY PLACED HDPE PIPE 20 EAST OF THIS LOCATION TO THE EAST TOWARDS PARK AVE, THIS PIPE MAY NOT HAVE BEEN INSPECTED AND MAY NEED A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD IF WE DID NOT INSPECT. I ADVISED KEV |
|
08/11/2020 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by DROBERT5 - TRACKOUT MATERIAL IS BEING CLEANED FROM THE INTERSECTION |
11/07/2019 | ENGR Grading Final | BBenedon | Correction Required | Entered by DROBERT5 - 09154 stormwater follow up. Continued. There is track out onto Park Avenue that needs to be cleaned. Borderland is not on site at this time. |
08/11/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
08/24/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VVERA1 - CN /POURING TOMORROW ONE CATCH BASIN |
01/15/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - FOR 3300 S PARK AVE - ALL AREAS ARE READY TO PLACE FORMS FOR THE PLACEMENT OF CONCRETE |
01/15/2021 | ENGR Grading Final | DROBERTS | Cancelled | Entered by VLEON1 - FOR 3250 S PARK AVE - ALL AREAS ARE READY TO PLACE FORMS FOR THE PLACEMENT OF CONCRETE |
01/15/2021 | ENGR Grading Final | DROBERTS | Cancelled | Entered by VLEON1 - FOR 3010 S PARK AVE - ALL AREAS ARE READY TO PLACE FORMS FOR THE PLACEMENT OF CONCRETE |