Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 03/03/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by SFLORES2 - |
| 03/03/2020 |
PDSD Engineering Division Pre-Construction SITE |
DROBERTS |
Partial Approval |
Entered by SFLORES2 - BRIAN AND I MET WITH THE CONTRACTOR FOR THE SITE AND DISCUSSED WHAT WE WILL NEED BEFORE THE SITE CAN BE FULLY APPROVED. WE HAVE REMINDED THEM TO CALL IN THE INTERMEDIATE GRADING EVERY WEEKS TO ENSURE THAT WE STAY ON. TOP OF EVERYTHING. THEY WILL START THE DEMO WORK ON THIS SITE ON THURSDAY, AND ANTICIPATE THAT THIS WORK SHOULD BE COMPLETED BY THE END OF APRIL. |
| 03/03/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by SFLORES2 - |