Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP19-0165

Parcel: 125100660


Addresses:

3102 E 2ND ST


Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Permit Number - DP19-0165

Inspection Description - PDSD Engineering Division Pre-Construction SITE

Inspection Status - Passed

Date Description Inspector Results Comments
03/16/2022 PDSD Engineering Division Pre-Construction SITE BBENEDON Approved Entered by VVERA1 - Approved
03/10/2020 PDSD Engineering Division Pre-Construction SITE BBENEDON Continued Entered by DMERANZ1 - Contractor has installed 8 inch waddle with no overlap around site perimeter and track out protection. Main entrance is on the north end of the site off of second St., secondary entrance is on the east portion of the site. Keep all rocks and dirt off of the street at all times. Temporary fence has been installed with screen barrier, barrier has no air slots provided. Potential hazard of fence falling over in Highwinds. Super Johnny Campbell 433-2983. Not at his desk. Main office in main church building enter through the rear, second story.