Inspection History Details
Inspection Status: Complete (Recurring)
Inspection History: SITE - Stormwater Setup and Controls
Permit Number - DP19-0164
Inspection Description - SITE - Stormwater Setup and Controls
Inspection Status - Complete (Recurring)
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/31/2022 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN /INSTALLING 15 RCP ON THE NORTH END OF THE BUILDING 2 RUNS 40LF. EACH. |
01/26/2022 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VVERA1 - CN/ GOOD AS OF TODAY |
10/07/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by RSALDAT1 - CN /GOOD AT IS TIME |
08/25/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by NGARCIA3 - ) CN FORMING CATCH BASIN A1 THE REBAR IS SITTING ON THE STORM DRAIN PIPE NEED TO MOVE IT UP 11/2TO 2 INCHES UP .JAMES WILL TAKE A PHOTO AND SEND TO ME WHEN COMPLETED. |
07/29/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by RSALDAT1 - CN /POURING ONE HEADWALL AND. CATCH BASIN NORTHWEST OF THE SITE. |
07/22/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by RSALDAT1 - CN /TWO CATCH BASIN ARE TO WET TO POUR TODAY. THE CATCH BASIN ARE AT THE NORTHWEST OF SITE. |
07/02/2021 | SITE - Stormwater Setup and Controls | DROBERTS | Continued | Entered by VLEON1 - CONTINUED, NO CONCERNS DURING THIS INSPECTION |
06/28/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - CN /POURING TWO CATCH BASIN ON THE NORTHWEST OF THE BUILDING. |
06/25/2021 | SITE - Stormwater Setup and Controls | DROBERTS | Continued | Entered by VLEON1 - CONTINUED AT THIS TIME, NO CONCERNS NOTED DURING THIS INSPECTION. |
06/23/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - CN / INSTALLING 10 STORM DRAIN PIPE |
06/15/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - CN/ FORMED THREE CATCH BASIN AND ONE HEADWALL,SOME STORM DRAINAGE PIPE. |
05/27/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - CN /PUSH BACK THE POUR FOR THE CATCH BASIN FOR TOMORROW. |
05/26/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - CN TWO CATCH BASIN ARE TO POUR. |
05/25/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - CN NEED TO ADDRESS THE ELEVATION AT THE WEST END OF THE MAI BUILDING.FOR DRAINAGE. |
05/24/2021 | SITE - Stormwater Setup and Controls | DROBERTS | Partial Approval | Entered by VLEON1 - PARTIAL, THIS INSPECTIONS IS NOT REQUIRED AT THIS TIME TIL ADDITIONAL MATERIALS HAVE BEEN INSTALLED. 09154 (STORMWATER FOLLOW-UP) NO CONCERNS AT THIS TIME DURING THIS INSPECTION. |
05/22/2021 | SITE - Stormwater Setup and Controls | DROBERTS | Continued | Entered by DROBERT5 - THIS INSPECTION IS NOT REQUIRED AT THIS TIME, SCHEDULE THIS INSPECTION WHEN ANY OG THE CONTROLS HAVE BEEN CHANGED OR ADDED. IN THE FUTURE SCHEDULE 09154 STORMWATER FOLLOW UP EVERY 2 WEEKS. |
05/19/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - 24” STORM DRAIN PIPE BACKFILLING. |
05/18/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - NSTALL OF CONTROLS .10” SOUTH OF BUILDING TWO |
05/17/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - CN / INSTALLING 24” STORM DRAIN PIPE ON THE NORTH EAST END OF PROJECT. |
05/13/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - CN / INSTALLING 36”,30” and 24” STORM DRAIN PIPE THE NORTH OF THE MAIN BUILDING AND THREE HEADWALL SOUTH OF THE MAIN BUILDING. |
05/11/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE 10 INCH STORM DRAIN |
04/21/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - CN INSPECTED FOUR CATCH BASIN .POUR TOMORROW. |
04/16/2021 | SITE - Stormwater Setup and Controls | DROBERTS | Continued | Entered by VLEON1 - |
03/31/2021 | SITE - Stormwater Setup and Controls | DROBERTS | Continued | Entered by RSALDAT1 - 2200 CN CATCH. AND 36” STORM DRAIN |
03/10/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - CN. INSTALL THE STORMWATER LINE ON THE WEST OF THE BUILDING UNDER THE FIRE LINE RUN. |
03/08/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - |
02/23/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE INSTALLING STORMWATER PIPE 15 INCH |