Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP19-0159
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| ENGR Engineering Final | Not Ready | |||
| 09/17/2025 | ENGR Engineering Final | Not Ready | There is no rip rap on the site. There is a check dam, but it is in the wrong location and does not have rip rap per plan. There is no weir and outlet built of grouted riprap with a toe down per the detail/ section 3. Call us back out when ready. Or you can submit a revision. |
|
| 10/08/2025 | ENGR Engineering Final | Not Ready | Engineer needs to submit As-Built plan set including all changes. Request Engineering Final Inspection when accepted by the city. | |
| 11/12/2025 | ENGR Engineering Final | Passed |