Permit: DP19-0158

Parcel: 13216600A


Addresses:

4004 S PARK AV


Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP19-0158

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
05/25/2021 ENGR Engineering Final MHERNANDEZ Approved Entered by VLEON1 -
03/20/2020 ENGR Engineering Final BBENEDON Partial Approval Entered by SFLORES2 - Solons portion of the work has been completed, however there is additional work shown on the development package plan. I explain to Luis that all of the work shown on the plan has to be completed for final approval.
12/27/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Work is in progress.
05/25/2021 ENGR Engineering Final MHERNANDEZ Approved Entered by VLEON1 -
03/20/2020 ENGR Engineering Final BBENEDON Partial Approval Entered by SFLORES2 - Solons portion of the work has been completed, however there is additional work shown on the development package plan. I explain to Luis that all of the work shown on the plan has to be completed for final approval.
12/27/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Work is in progress.