Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP19-0132

Parcel: 11942006J


Addresses:

4555 S MISSION RD


Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP19-0132

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
11/06/2019 ENGR Engineering Final JV Approved Entered by JVWINKL1 - Substantial conformance letter supplied by Rick Engineering. See Sire
10/22/2019 ENGR Engineering Final BBENEDON Partial Approval Entered by KROBLES1 - partially approved. Dave with Barker Provide letter of compliance from Rick Engineering as noted .
11/06/2019 ENGR Engineering Final JV Approved Entered by JVWINKL1 - Substantial conformance letter supplied. See document in Sire
10/22/2019 ENGR Engineering Final BBENEDON Partial Approval Entered by KROBLES1 - partially approved. Dave with Barker Provide letter of compliance from Rick Engineering as noted .