Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 06/04/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by RSALDAT1 - Approved. Brian S w Sundt 602-920-9855. Project is half acre. Project entrance east side of site. Drainage to the north east. Provide stormwater protection as needed and schedule stormwater controls inspection. Please post site address. There is no trash enclosure and no below ground rainwater piping, or basin. Project anticipated completion June 2021.
|
| 05/29/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready. Please provide contact information when scheduling inspections. Please schedule a preconstruction meeting as required. Install controls and signage as required.
|
| 05/29/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready. Please provide contact information when scheduling inspections. Please schedule a preconstruction meeting as required. Install controls and signage as required.
|