Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP19-0117
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
11/26/2019 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - No grading activity at this time. |
07/31/2019 | ENGR Engineering Final | EH | Prior to Final Inspectn | Entered by EHAMBLI1 - Applicant is scaling back scope of work to just include changes to the loading dock. Other modifications proposed were not required per code. Can be approved with only loading dock change. |
10/26/2023 | ENGR Engineering Final | Passed |