Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 11/15/2019 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - East channel has hand placed Rip rap on both banks. West channel has concrete on West bank only nothing on East Bank dirt only. |
| 10/11/2023 |
ENGR Engineering Final
|
|
Re-inspection required |
Rip Rap areas are nor completed to plan or completed with either weed mat or grout |
| 10/11/2023 |
ENGR Engineering Final
|
|
Re-inspection required |
Rip Rap areas are nor completed to plan or completed with either weed mat or grout |