Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP19-0113
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
10/27/2022 | ENGR Engineering Final | Not Ready | ||
11/15/2019 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - East channel has hand placed Rip rap on both banks. West channel has concrete on West bank only nothing on East Bank dirt only. |
10/11/2023 | ENGR Engineering Final | Re-inspection required | Rip Rap areas are nor completed to plan or completed with either weed mat or grout | |
10/11/2023 | ENGR Engineering Final | Re-inspection required | Rip Rap areas are nor completed to plan or completed with either weed mat or grout |