Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 01/29/2020 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 01/15/2020 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - New controls have been installed. |
| 01/03/2020 |
SITE - Stormwater Setup and Controls |
RLEDONNE |
Continued |
Entered by SFLORES2 - |
| 12/12/2019 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by DMERANZ1 - Install controls at small section between block walls at northwest corner. Install controls if needed along eastern perimeter adjacent to existing drainage canal. Keep all dirt on site and out of existing drainage and roadways. |