Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/29/2020 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 01/15/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Doug. Is starting excavation for water harvesting area along north and west portions of the site. Doug anticipates most of the material will be relocated within the site. |
| 01/07/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Contractors working on utilities at building entrance. |
| 12/20/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by SFLORES2 - contractor preparing final grade at landscape areas |
| 12/20/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by SFLORES2 - contractor preparing final grade at landscape areas |
| 12/12/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Call for inspection when constructing check dams, riprap, the low-grade storm drains and accessible areas. Pay attention to water harvesting requirements on plan. 6 inches is required as noted. |
| 12/12/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 12/12/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 12/12/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 12/10/2019 |
ENGR Grading Final |
BBENDDON |
Continued |
Entered by SFLORES2 - I spoke with Doug from WEO Neil and requested That he schedule a preconstruction meeting |
| 12/10/2019 |
ENGR Grading Final |
BBENDDON |
Continued |
Entered by SFLORES2 - I spoke with Doug from WEO Neil and requested That he schedule a preconstruction meeting |