Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP19-0099

Parcel: Unknown


Addresses:

2626 E RIVER RD


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP19-0099

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
01/29/2020 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
01/15/2020 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Doug. Is starting excavation for water harvesting area along north and west portions of the site. Doug anticipates most of the material will be relocated within the site.
01/07/2020 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractors working on utilities at building entrance.
12/20/2019 ENGR Grading Final BBENEDON Continued Entered by SFLORES2 - contractor preparing final grade at landscape areas
12/20/2019 ENGR Grading Final BBENEDON Continued Entered by SFLORES2 - contractor preparing final grade at landscape areas
12/12/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Call for inspection when constructing check dams, riprap, the low-grade storm drains and accessible areas. Pay attention to water harvesting requirements on plan. 6 inches is required as noted.
12/12/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
12/12/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
12/12/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
12/10/2019 ENGR Grading Final BBENDDON Continued Entered by SFLORES2 - I spoke with Doug from WEO Neil and requested That he schedule a preconstruction meeting
12/10/2019 ENGR Grading Final BBENDDON Continued Entered by SFLORES2 - I spoke with Doug from WEO Neil and requested That he schedule a preconstruction meeting