Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 09/01/2020 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by JSCHNEI2 - Approved. |
| 07/17/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RSALDAT1 - Continue. Rebar for mat Inside trash enclosure OK. Call back for rebar for approach. |
| 07/01/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RSALDAT1 - Continue. FaceTime inspection for walls only on trash enclosure.
|
| 06/10/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RSALDAT1 - Continue. Trash enclosure rebar for first 4 feet and wall OK per FaceTime with GC.
|
| 05/21/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RSALDAT1 - Continue. Footer for trash enclosure rebar OK. FaceTime inspection with GC.
|
| 10/29/2020 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by PAHUMAD1 - |
| 09/22/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RSALDAT1 - Continue. Walk site with GC went over slopes on sidewalks and trash enclosure. Dave Roberts stopping by in the afternoon to go over slopes with GC.
|
| 09/18/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RSALDAT1 - Continue. Walk site with GC check slopes on sidewalks on East side of building at Street and a long drive on south side of building southCross slopes were over 2% GC indicated with paint. |
| 09/17/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by JSCHNEI2 - Continue. Walk site with GC went over sideways along sewer easement to the east and accessible pathway to the building called Steve shields He said install per approved plans. |
| 09/15/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by JSCHNEI2 - Continue working on grading on site parking and Driveway.
|
| 08/31/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RSALDAT1 - Continue. Working on form boards for sidewalks trash enclosure approach starting on rebar on trash enclosure Approach. |
| 08/10/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by JSCHNEI2 - Continue. No grading activity at this time working on forms for concrete pour. |
| 07/28/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by JSCHNEI2 - Continue. Talked with GC about traffic barricadesSent over detail 106 per PAG. Per approved plans. |
| 06/18/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RSALDAT1 - Continue. No grading activity at this time working on building only. |
| 05/28/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RSALDAT1 - Continue. No grading activity on site at this time. |
| 05/18/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RSALDAT1 - Continue. Working on curbs on south side of building. |
| 05/05/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RSALDAT1 - No grading activity at this time. Working on building only. |
| 03/26/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by SFLORES2 - No grading activity at this time. |
| 03/10/2020 |
ENGR Grading Final |
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - Stormwater plan not on site has not been installed met with GC on site to install stormwater controls and all NOI Info at gate.
|
| 02/05/2020 |
ENGR Grading Final |
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - Work has started on site no pre-con that I’m aware of GC not on site at this time.
|
| 11/06/2020 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by PAHUMAD1 - |
| 11/06/2020 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by PAHUMAD1 - |
| 11/27/2019 |
ENGR Grading Final |
RLEDONNE |
Not ready for Inspection |
Entered by SFLORES2 - Grading activity has started on site. Equipment on site. No activity at this time.
|