Permit: DP19-0082

Parcel: 136301380

Inspection Status: Not Ready

Inspection History: SITE - Stormwater Setup and Controls

Permit Number - DP19-0082

Inspection Description - SITE - Stormwater Setup and Controls

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/26/2022 SITE - Stormwater Setup and Controls Not Ready
08/09/2019 SITE - Stormwater Setup and Controls RLEDONNE Not ready for Inspection Entered by DMERANZ1 - starting next week on the install of controlled.?
08/08/2019 SITE - Stormwater Setup and Controls RLEDONNE Not ready for Inspection Entered by DMERANZ1 - Contractor Unable to make meeting.
11/09/2023 SITE - Stormwater Setup and Controls Partial Pass Jake Wallace and Dave Roberts need to get together and walk through phase 1A. At that time Jake will have landscaping plans and plot plans.
11/15/2022 SITE - Stormwater Setup and Controls Complete (Recurring) STORMWATER is completed but not ready for a final
11/15/2023 SITE - Stormwater Setup and Controls Not Ready 2nd time that I have mentioned this,
1) clean up concrete washout area and remove all spoils from surrounding area including stucco washouts from your stucco contractor
2) ensure that all Porta John’s are staked or strapped down.