Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Setup and Controls
Permit Number - DP19-0082
Inspection Description - SITE - Stormwater Setup and Controls
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | SITE - Stormwater Setup and Controls | Not Ready | ||
08/09/2019 | SITE - Stormwater Setup and Controls | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - starting next week on the install of controlled.? |
08/08/2019 | SITE - Stormwater Setup and Controls | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Contractor Unable to make meeting. |
11/09/2023 | SITE - Stormwater Setup and Controls | Partial Pass | Jake Wallace and Dave Roberts need to get together and walk through phase 1A. At that time Jake will have landscaping plans and plot plans. | |
11/15/2022 | SITE - Stormwater Setup and Controls | Complete (Recurring) | STORMWATER is completed but not ready for a final | |
11/15/2023 | SITE - Stormwater Setup and Controls | Not Ready | 2nd time that I have mentioned this, 1) clean up concrete washout area and remove all spoils from surrounding area including stucco washouts from your stucco contractor 2) ensure that all Porta John’s are staked or strapped down. |