Permit: DP19-0082

Parcel: 136301380

Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Permit Number - DP19-0082

Inspection Description - ENGR Grading Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
03/12/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 - Working on utilities and house framing.
02/11/2020 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - No grading activity at this time due to rain.
02/10/2020 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Working on east side of project.
10/18/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - No grading activity at this time.
04/12/2022 ENGR Grading Final MHERNANDEZ Continued Entered by NGARCIA3 - CN MARK ALL THE HOMES LEFT TO BE CONSTRUCTED THERE IS 55 LOT THAT NEED TO BE CONSTRUCTED
04/20/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 -
03/31/2021 ENGR Grading Final MHERNANDEZ Continued Entered by RSALDAT1 - CN.
10/27/2020 ENGR Grading Final RLEDONNE Continued Entered by PAHUMAD1 - Continue. No grading activity at this time working on houses.
09/21/2020 ENGR Grading Final RLEDONNE Continued Entered by JSCHNEI2 - Continue. Working in right of way final grading on private streets.
08/18/2020 ENGR Grading Final RLEDONNE Continued Entered by JSCHNEI2 - Continue. Working on houses no grading activity at this time.
08/10/2020 ENGR Grading Final RLEDONNE Continued Entered by JSCHNEI2 - Continue. Working on preparation for asphalt and curbs.
08/06/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Working on laying down AB and Roads getting ready for paving.
07/27/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Installed 48 inch RCP pipe on outlet side of basin on southside of sight. And a 36 inch RCP on inlet side. Working on grading roads and installing curves.
06/25/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. No grading activity at this time.
06/23/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. No activity on this site at this time.
06/17/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue.Grading activity has resumed on house pads and roadways around site.
06/05/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. No grading activity at this time.
05/18/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - No grading activity at this time.
05/05/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - No grading activity on site at this time.
04/20/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Working on model houses. Cable contractor on site. No grading activity at this time.
02/10/2020 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Working on surveying streets and utilities.
01/13/2020 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Working on site utilities and house pads.
11/25/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Basin Gunite On east west side of basin. Inlet outlet open. Working on sewer laterals. Repairs to waddle on south side of site and north side of state have been added.
10/31/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Working on utilities and house pads.
10/18/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Rough grading on pads and streets no activity at this time.
11/04/2020 ENGR Grading Final RLEDONNE Continued Entered by PAHUMAD1 - Continue. Inspection based off of detail sent by Lance Osborne sheet eight of nine basin head wall wing wall detail 2020. Headwall off a liner book drive at east end.Basin on south side of site detail based off of a.headwall SD 6.3 Dash one sent by Brian Johnson from Desert Earth.
10/21/2020 ENGR Grading Final RLEDONNE Partial Approval Entered by RSALDAT1 - Partial approval. Plans on site did not give detail contacted Brian from Desert Earth he will be supplying me with more information Took photos and dimensions.
11/12/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Have installed welded wire four-inch. Per approved plan applyingConcrete per approved plan.
11/08/2023 ENGR Grading Final Not Ready 1) Concrete washout is a mess and needs to be cleaned out, spoils on the dirt and overflowing.
2) All nursery stakes need to be removed from trees throughout project in the front yards of almost every home.
11/15/2023 ENGR Grading Final Passed