Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 11/08/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by DMERANZ1 - Boyd w Borderlands 260-7715 |
| 05/15/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Denied |
Entered by DMERANZ1 - No supervision on site for meeting, and no message was provided. Contractor is in the process of grading the site. SWPPP information is posted. Please post job site address. Please re-schedule preconstruction meeting and provide contact information required, And city approved construction documents. |
| 05/15/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Denied |
Entered by DMERANZ1 - No supervision on site for meeting, and no message was provided. Contractor is in the process of grading the site. SWPPP information is posted. Please post job site address. Please re-schedule preconstruction meeting and provide contact information required, And city approved construction documents. |