Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP19-0080
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/08/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Approved | Entered by DMERANZ1 - Boyd w Borderlands 260-7715 |
05/15/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Denied | Entered by DMERANZ1 - No supervision on site for meeting, and no message was provided. Contractor is in the process of grading the site. SWPPP information is posted. Please post job site address. Please re-schedule preconstruction meeting and provide contact information required, And city approved construction documents. |
05/15/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Denied | Entered by DMERANZ1 - No supervision on site for meeting, and no message was provided. Contractor is in the process of grading the site. SWPPP information is posted. Please post job site address. Please re-schedule preconstruction meeting and provide contact information required, And city approved construction documents. |