Permit: DP19-0080

Parcel: 132130750


Addresses:

3010 S PARK AV


Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Permit Number - DP19-0080

Inspection Description - ENGR Grading Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
01/25/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 - CONTINUE FOR 3350 S PARK AVE
01/25/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 - CONTINUE FOR 3300 S PARK AVE
01/25/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 - CONTINUE FOR 3010 S PARK AVE
10/05/2020 ENGR Grading Final DROBERTS Partial Approval Entered by JSCHNEI2 - PARTIALLY APPROVED AT THIS TIME FOR THE DRAINAGE STRUCTURE ON THE WEST SIDE OF THE ROUND ABOUT.
10/05/2020 ENGR Grading Final DROBERTS Partial Approval Entered by JSCHNEI2 - PARTIALLY APPROVED AT THIS TIME FOR THE DRAINAGE STRUCTURE ON THE WEST SIDE OF THE ROUND ABOUT.
10/05/2020 ENGR Grading Final DROBERTS Partial Approval Entered by JSCHNEI2 - PARTIALLY APPROVED AT THIS TIME FOR THE DRAINAGE STRUCTURE ON THE WEST SIDE OF THE ROUND ABOUT.
10/01/2020 ENGR Grading Final BBENEDON Partial Approval Entered by JSCHNEI2 - Partially approved. Main roadway roundabout.
10/01/2020 ENGR Grading Final BBENEDON Partial Approval Entered by JSCHNEI2 - Partially approved. Main roadway roundabout.
10/01/2020 ENGR Grading Final BBENEDON Partial Approval Entered by JSCHNEI2 - Partially approved. Main roadway roundabout.
09/29/2020 ENGR Grading Final BBENEDON Continued Entered by JSCHNEI2 - Continued. No rebar specified for this installation.
09/29/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. No rebar specified for this installation.
04/12/2022 ENGR Grading Final Passed {Activity date: 04/12/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - COMPLETED
3350 S Park Av} ; {Activity date: 05/24/2021; Status: Cancelled; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE FOR 3350 S PARK AV} ; {Activity date: 11/19/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. Material hauling in progress. North entrance is being used.} ; {Activity date: 11/04/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. Work on going in right of way. Large material stock piles and debris piles on site.} ; {Activity date: 10/30/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No activity on site at this time. Large material stock piles on site} ; {Activity date: 10/08/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by VFLORES1 - Sewer utility work in northeast portion of the site. Additionally work in the right of way} ; {Activity date: 10/06/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Partially approved.Roundabout has been Paved. Contractor is finishing up drainage canal.} ; {Activity date: 10/05/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - CONTINUED AT THIS TIME, PAVING TO BE PLACED IN THE ROUND ABOUT TODAY} ; {Activity date: 10/05/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - CONTINUED AT THIS TIME, PAVING TO BE PLACED IN THE ROUND ABOUT TODAY} ; {Activity date: 10/05/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - CONTINUED AT THIS TIME, PAVING TO BE PLACED IN THE ROUND ABOUT TODAY

} ; {Activity date: 10/02/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Partial approve, rip rap at basin overflow and drainage canal into basin} ; {Activity date: 10/01/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Partially approved. Main roadway roundabout.} ; {Activity date: 10/01/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Partially approved. Main roadway roundabout.

} ; {Activity date: 10/01/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Partially approved. Main roadway roundabout.} ; {Activity date: 09/30/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - . Partially approved. Roundabout pre-pavement} ; {Activity date: 09/29/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Partially approved. Grading for roundabout. Also filter fabric installed in drainage canal into basin.} ; {Activity date: 09/29/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Grading for roundabout. Also filter fabric installed in drainage canal into basin.} ; {Activity date: 09/17/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. There is no activity on site at this time. There are material and debris stock piles placed throughout the site. No stabilization has been installed. Roundabout roadway construction has not started.

} ; {Activity date: 09/04/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Site has been rough graded and the majority of the utility work aspect. There’s a little activity on the site at this time. Development services requested stabilization for all disturbed areas.} ; {Activity date: 08/20/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved.Below ground concrete storm channels under west end of main Road. OK from engineer to install with tongue facing Upstream} ; {Activity date: 08/03/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Temporary asphalt has been installed to access the new school building} ; {Activity date: 07/29/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Contractor installing asphalt main roadway. On site grading in progress. Large material stock piles on site. Utility work and progress. Please provide contact information with scheduling inspections.

} ; {Activity date: 07/29/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Contractor installing asphalt main roadway. On site grading in progress. Large material stock piles on site. Utility work and progress. Please provide contact information with scheduling inspections.} ; {Activity date: 07/29/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Contractor installing asphalt main roadway. On site grading in progress. Large material stock piles on site. Utility work and progress. Please provide contact information with scheduling inspections.} ; {Activity date: 07/23/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Contractor preparing for road access to preparation for opening of Jay Ted. I’m going utility work on site and within the right of way.} ; {Activity date: 07/23/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS CONTINUED AT THIS TIME. THIS INSPECTION WAS PERFORMED TODAY TO SEE WHAT IS NEEDED FOR THE SITE TO BE GIVEN A TCO FOR RHE JTED SITE. I HAVE ADVISED THE CONTRACTOR/BORDERLAND TO PROVIDE THIS DEOARTMENT WITH A PLAN SHOWING THE MINOR MODIFICATIONS TO THE SITE THAT WILL PROVIDE ACCESS FROM PARK AVENUE TO THE BUILDING IN QUESTION FOR BOTH VEHICULAR AND PEDESTRIAN TRAFFIC. THIS PLAN WILL BE SUBMITTED TO STEVE SHIELDS AND JOHN VAN WINKLE TO BE REVIEWED AND APPROVED BY ALL DEPARTMENTS AS NEEDED.
I ALSO HAVE CALLED INTO QUESTION THE SIGNAL LIGHTS AT PARK THAT HAVE MOT BEEN CHANGED FOR THE FUTURE MOVEMENT OF TRAFFIC AT JTED. THE CONTRACTOR ADVISED ME THAT PACE CONSTRUCTION WILL BE MEETING WITH THE TRANSPORTATION DEPARTMENT TO DISCUSS THE MIDIFICATIONS THAT WILL BE NEEDED.} ; {Activity date: 07/23/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Contractor preparing for road access to preparation for opening of Jay Ted. I’m going utility work on site and within the right of way.} ; {Activity date: 07/22/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Grading for drainage into Basin. Continued utility work and grading. Curbs along main thorough fare. a B spread for asphalt roadway.
} ; {Activity date: 07/22/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Grading for drainage into Basin. Continued utility work and grading. Curbs along main thorough fare. a B spread for asphalt roadway.


} ; {Activity date: 07/22/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Grading for drainage into Basin. Continued utility work and grading. Curbs along main thorough fare. a B spread for asphalt roadway.
} ; {Activity date: 07/21/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Utility work and grading in progress.
} ; {Activity date: 07/13/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Partially approved. Installing curbs and grading of roadway. Installing west perimeter fencing and utilities. Stock piles of material and construction debris on site

} ; {Activity date: 07/13/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Partially approved. Installing curbs and grading of roadway. Installing west perimeter fencing and utilities. Stock piles of material and construction debris on site} ; {Activity date: 07/13/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Partially approved. Instal
11/05/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor is grading the site. There are many stock piles of materials and debris.
05/15/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor is in the process of grading site.
05/15/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor is in the process of grading site.