Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP19-0079
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/25/2020 | ENGR Engineering Final | RLEDONNE | Approved | Entered by DMERANZ1 - |
02/21/2020 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Have approved revisions on site.Complete all striping of ADA parking area. |
02/13/2020 | ENGR Engineering Final | RLEDONNE | Partial Approval | Entered by DMERANZ1 - engineering final notes apply to grading final. |
02/05/2020 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - All notes pertaining to engineering final apply to grading final |
02/25/2020 | ENGR Engineering Final | RLEDONNE | Approved | Entered by DMERANZ1 - |
02/21/2020 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Have approved revisions on site.Complete all striping of ADA parking area. |
02/13/2020 | ENGR Engineering Final | RLEDONNE | Partial Approval | Entered by DMERANZ1 - OK for TCO. For final Complete all work on approved plans provide revisions for all changes to approved plans. |
02/06/2020 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Walked with GC checked out ADA parking went over approved plans. |
02/05/2020 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Complete all work on approved plans. Provide approved COT revisions for all changes to approve plans. |