Inspection Status: Passed
Inspection History: SITE - Stormwater Final Inspection
| Date |
Description |
Inspector |
Results |
Comments |
| 11/03/2020 |
SITE - Stormwater Final Inspection |
BBENEDON |
Approved |
Entered by PAHUMAD1 - Approved. |
| 10/12/2020 |
SITE - Stormwater Final Inspection |
DROBERTS |
Not ready for Inspection |
Entered by VFLORES1 - IS NOT READY, SEE PREVIOUS COMMENTS, PROVIDE CLOSE OUT DOCUMENTATION (NOT, REVISED APPROVED DRAWINGS, CERTIFICATION LETTER FROM THE ENGINEER OF RECORD. |
| 10/05/2020 |
SITE - Stormwater Final Inspection |
DROBERTS |
Denied |
Entered by JSCHNEI2 - DENIED, SEE PREVIOUS COMMENTS, AND PROVIDE THE FOLLOWING ITEMS: 1) STAMPED AND SEALEC CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR ALL THE DRAINAGE WORK THAT HAS NOT BEEN INSPECTED, CATCH BASINS/INLET STRUCTURES, PIPE. 2) ENSURE ALL WATER HARVESTING BASINS HAVE A DEPTH OF 6 INCHES BELOW THE LOWEST INLET OPENING. 3) PROVIDE THIS DEPARTMENT WITH THE NOTICE OF TERMINATION LETTER FROM ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY FOR THIS SITE |
| 10/02/2020 |
SITE - Stormwater Final Inspection |
BBENEDON |
Not ready for Inspection |
Entered by JSCHNEI2 - Not ready. Provide NOT if applicable. Remove construction debris, rocks and dirt from existing concrete drainage canal and from catch basins.
|
| 08/11/2020 |
SITE - Stormwater Final Inspection |
BBENEDON |
Not ready for Inspection |
Entered by JSCHNEI2 - Not ready. Courtesy inspection. Provide notice of termination for SWPPP permit for final approval
|