Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP19-0077
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/24/2021 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
10/06/2020 | ENGR Grading Final | BBENEDON | Not ready for Inspection | Entered by JSCHNEI2 - Not ready. Andrew general contractor. The landscaped island at the south west corner of the site needs to be lowered roughly 6 inches below the inlet of that area so that water can accumulate and flow through. |
10/05/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by JSCHNEI2 - APPROVED |
10/02/2020 | ENGR Grading Final | BBENEDON | Denied | Entered by JSCHNEI2 - Denied. Remove construction debris, rocks and dirt from new catch basin‘s and existing drainage canal along eastern edge of jobsite. Install long-term bicycle parking as specified. Depress landscaped island below curb opening inlets, to allow water entry and retention. Handicap parking signs were not installed per details. Provide a stamped letter from your engineer of record confirming that the trash enclosure, built without inspections, was constructed as required per COT standard detail 6.01. Provide a stamped letter from your engineer of record confirming that all catch basins and below grade stormwater piping, also not inspected, was installed and sized as shown on approved construction documents and in accordance with product installation requirements. Provide a stamped letter from your engineer confirming that site grading was installed per approved construction documents. |
08/14/2020 | ENGR Grading Final | BBENEDON | Not ready for Inspection | Entered by JSCHNEI2 - 09027. 09190, 09185. Not ready. Unscheduled courtesy inspection for Andrew with Itsa contracting at 343-9009. Complete the work shown on development package permit 19 Dash0077. Schedule for all inspections required to do that activity. Please schedule or provide history of sign inspections. Provide a letter from your engineer of record certifying site grading and all below ground stormwater piping and that your trash enclosure was built in accordance with City of Tucson standard detail 601 as required, because no inspections were performed for your civil drawings and development package permit. |
10/02/2020 | ENGR Grading Final | BBENEDON | Approved | Entered by JSCHNEI2 - Approved |
10/02/2020 | ENGR Grading Final | BBENEDON | Approved | Entered by JSCHNEI2 - Approved |
11/03/2020 | ENGR Grading Final | BBENEDON | Approved | Entered by PAHUMAD1 - Approved. |
10/12/2020 | ENGR Grading Final | DROBERTS | Not ready for Inspection | Entered by VFLORES1 - PROVIDE A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD STATING THAT THIS STRUCTURE WAS BUILT ACCORDING TO THE APPROVED SINCE IT WAS NOT INSPECTED. |
10/05/2020 | ENGR Grading Final | DROBERTS | Not ready for Inspection | Entered by JSCHNEI2 - NOT READY AT THIS TIME. SINCE THIS TRASH ENCLOSURE WAS NOT INSPECTED BY THIS DEPARTMENT A STAMPED AND SEALED CERTIFICATION LETTER FROM THE ENGINEER OF RECORD WILL BE REQUIRED NOTING THAT THIS WAS CONSTRUCTED IN ACCORDANCE TO THE APPROVED PLANS. |
10/02/2020 | ENGR Grading Final | BBENEDON | Denied | Entered by JSCHNEI2 - Denied. Remove construction debris, rocks and dirt from new catch basin‘s and existing drainage canal along eastern edge of jobsite. Install long-term bicycle parking as specified. Depress landscaped island below curb opening inlets, to allow water entry and retention. Handicap parking signs were not installed per details. Provide a stamped letter from your engineer of record confirming that the trash enclosure, built without inspections, was constructed as required per COT standard detail 6.01. Provide a stamped letter from your engineer of record confirming that all catch basins and below grade stormwater piping, also not inspected, was installed and sized as shown on approved construction documents and in accordance with product installation requirements. Provide a stamped letter from your engineer confirming that site grading was installed per approved construction documents. |