Permit: DP19-0077

Parcel: 132131030


Addresses:

2985 S KINO PW


Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP19-0077

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
10/20/2020 ENGR Engineering Final BBENEDON Approved Entered by RSALDAT1 - Approved
10/06/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by JSCHNEI2 - Not ready. Still need long-term bicycle parking and grading correction. And stamped letter from the engineer certifying compliance of trash enclosure.
10/05/2020 ENGR Engineering Final DROBERTS Approved Entered by JSCHNEI2 - APPROVED
10/02/2020 ENGR Engineering Final BBENEDON Denied Entered by JSCHNEI2 - Denied. Remove construction debris, rocks and dirt from new catch basin‘s and existing drainage canal along eastern edge of jobsite. Install long-term bicycle parking as specified. Depress landscaped island below curb opening inlets, to allow water entry and retention. Handicap parking signs were not installed per details. Provide a stamped letter from your engineer of record confirming that the trash enclosure, built without inspections, was constructed as required per COT standard detail 6.01. Provide a stamped letter from your engineer of record confirming that all catch basins and below grade stormwater piping, also not inspected, was installed and sized as shown on approved construction documents and in accordance with product installation requirements. Provide a stamped letter from your engineer confirming that site grading was installed per approved construction documents.
08/14/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by JSCHNEI2 - 09027. 09190, 09185. Not ready. Unscheduled courtesy inspection for Andrew with Itsa contracting at 343-9009. Complete the work shown on development package permit 19 Dash0077. Schedule for all inspections required to do that activity. Please schedule or provide history of sign inspections. Provide a letter from your engineer of record certifying site grading and all below ground stormwater piping and that your trash enclosure was built in accordance with City of Tucson standard detail 601 as required, because no inspections were performed for your civil drawings and development package permit.
11/03/2020 ENGR Engineering Final BBENENDON Approved Entered by PAHUMAD1 - Approved.
10/12/2020 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by VFLORES1 - IS NOT READY SEE PREVIOUS COMMENTS, PROVIDE A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR ALL WORK THAT WAS NOT INSPECTED BY THIS DEPARTMENT. COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS OR PROVIDE US WITH AN APPROVED REVISED DRAWING SHOWING ALL THE ITEMS THAT HAVE BEEN CHANGED ON THIS SITE.
10/06/2020 ENGR Engineering Final BBENEDON Partial Approval Entered by JSCHNEI2 - Partial approval. Letter received from Tylor Web certifying storm drain, catch basins curb and site grading to plan locations and elevations.
10/05/2020 ENGR Engineering Final DROBERTS Denied Entered by JSCHNEI2 - DENIED. INSTALL ALL PREVIOUSLY NOTED DELINQUENT ITEMS AS NOTED DURING PREVIOUS INSPECTIONS, AND DURING THIS INSPECTION. THIS WILL INCLUDE BUT IS NOT LIMITED TO THE LONG TER AND SHORT TERM BICYCLE PARKING RACKS, BOXES, AS WELL AS THE CONCRETE PAD THAT HAS BEEN DELETED. ENSURE ALL LANDSCAPING ITEMS HAVE BEEN COMPLETED PER THE APPROVED PLANS. VERIFY THAT ALL DRAINAGE PIPES, BASINS, OR ANY OTHER ITEMS ARE AS SHOWN ON THE APPROVED PLANS. PROVIDE A COMPLETE APPROVED SET IF REVISED DRAWINGS SHOWING ALL ITEMS THAT HAVE BEEN CHANGED SINCE THE ORIGINAL APPROVALS. PROVIDE ALL STAMPED AND SEALED CERTIFICATION LETTERS FROM THE ENGINEER OF RECORD THAT STATE THAT IT HAS BEEN CONSTRUCTED PER THE APPROVED PLANS OR APPROVED REVISED DRAWINGS.
10/02/2020 ENGR Engineering Final BBENEDON Denied Entered by JSCHNEI2 - Denied. Remove construction debris, rocks and dirt from new catch basin‘s and existing drainage canal along eastern edge of jobsite. Install long-term bicycle parking as specified. Depress landscaped island below curb opening inlets, to allow water entry and retention. Handicap parking signs were not installed per details. Provide a stamped letter from your engineer of record confirming that the trash enclosure, built without inspections, was constructed as required per COT standard detail 6.01. Provide a stamped letter from your engineer of record confirming that all catch basins and below grade stormwater piping, also not inspected, was installed and sized as shown on approved construction documents and in accordance with product installation requirements. Provide a stamped letter from your engineer confirming that site grading was installed per approved construction documents.
08/14/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by JSCHNEI2 - 09027. 09190, 09185. Not ready. Unscheduled courtesy inspection for Andrew with Itsa contracting at 343-9009. Complete the work shown on development package permit 19 Dash0077. Schedule for all inspections required to do that activity. Please schedule or provide history of sign inspections. Provide a letter from your engineer of record certifying site grading and all below ground stormwater piping and that your trash enclosure was built in accordance with City of Tucson standard detail 601 as required, because no inspections were performed for your civil drawings and development package permit.
08/11/2020 ENGR Engineering Final BBENEDON Denied Entered by JSCHNEI2 - Denied. Unscheduled courtesy inspection. Project appears mostly complete however no inspections were done under this activity. Provide letter of certification from the engineer of record for this project certifying grade as specified in construction documents and certifying that the trash enclosure was built in accordance to City of Tucson standard detail 6.01. Complete any remaining work and schedule all required inspections for this activity.