Permit: DP19-0050

Parcel: 141363370

Inspection Status: Not Ready

Inspection History: SITE - Stormwater Final Inspection

Date Description Inspector Results Comments
10/26/2022 SITE - Stormwater Final Inspection Not Ready
01/06/2023 SITE - Stormwater Final Inspection Not Ready
01/20/2023 SITE - Stormwater Final Inspection Not Ready Complete all work on this Site as shown on the approved plan prior to calling this in for a final
02/03/2023 SITE - Stormwater Final Inspection Complete (Recurring) Complete all work on this site as shown on the plans Prior to calling in for a final inspection
05/01/2023 SITE - Stormwater Final Inspection Partial Pass Provide thisDepartment with a copy of the NOT Notice of Termination letter from the Arizona Department of Environmental Quality.
Complete all work as shown on the approved plans prior to scheduling this site for a final. This will include all landscaping for the site That may be included on DP17-0037. This site will be rescheduled for a sidewalk inspection for May 4 to be done by David Roberts. After that inspection, it will be determined what punchlist items will be needed and required prior to the full approval on this site.
06/23/2023 SITE - Stormwater Final Inspection Not Ready For a final on stormwater contact Dave Roberts
08/04/2023 SITE - Stormwater Final Inspection Not Ready Complete starting the Vertical Construction on all open lots prior to scheduling this inspection. Also provide this Department with the Notice of Termination Letter from the Arizona Department of Environmental Quality prior to scheduling future Inspections.
09/01/2023 SITE - Stormwater Final Inspection Not Ready Multiple areas thru out site need wattle or existing wattle re staked and adjusted.
09/29/2023 SITE - Stormwater Final Inspection Not Ready Complete all of the work on this site as shown on the Approved Drawings, provide Approved Drawings or Approved Revised Drawings for the Inspector to use during all Final Inspections. Once the Site has been Approved with Drawings you can then seek Final Approval and Closure for all open Permits as needed.

Prior to the Final Approval of this site you will need to provide the following Document/s before we can sign the project as finished and complete. Ensure that All Drawings represent the Site as it is, and that All Revision changes have been Submitted and Approved by the City of Tucson Review staff, no As-built Drawings will be accepted. Also provide a copy of the Notice Of Termination from the Arizona Department of Environmental Quality for the closing of the SWPPP for this Permit. Possible signed and Sealed Certification Letter from the Engineer of Record stating that the site was constructed per the Approved Drawings.
10/05/2023 SITE - Stormwater Final Inspection Not Ready Three Lots still have not been constructed done so the site cannot be closed at this time. Provide this department, the notice of termination from the Arizona Department of Environmental Quality for this permit if it has been closed out by ADEQ. The sidewalks will have to be poured and completed as shown on the approved plans if this site is needed to be closed for the Development Package. Also, the open lots will have to be covered with 2 inches of decompose granite to close this permit, or the permit will stay open till the houses have been constructed on these three Lot
10/27/2023 SITE - Stormwater Final Inspection Not Ready Ensure that all work is completed per the approved plans, and provide this department with the NOT Notice of Termination from the Arizona Department of Environment Quality for this Permit. What’s this information has been pre-AA inspection for this can be done and this portion of the permit can be approved.