Permit: DP19-0050

Parcel: 141363370

Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
05/13/2022 ENGR Grading Final DROBERTS Partial Approval Entered by NGARCIA3 - PARTIAL, CREWS WORKING ON NEEDED SITE WORK AS NEEDED FOR A FULL C OF O. 6395 E CAMINO BOLEADORAS
01/21/2022 ENGR Grading Final MHERNANDEZ Continued Entered by NGARCIA3 - CN/ NO CHANGE ON SITE AS OF TODAY
10/01/2021 ENGR Grading Final DROBERTS Continued Entered by NGARCIA3 - CHECK WITH THE CONTRACTOR TO DETERMINE WHAT THE PVC LINES ARE FOR ON THE WEST SIDE OF THE CUL DE SAC BEHIND THE SCUPPERS SOUTH OF LOT #63.
06/25/2021 ENGR Grading Final DROBERTS Continued Entered by VLEON1 - CONTINUED AT THIS TIME, CREWS CONTINUE TO WORK MOSTLY IN THE AREA OF ALL ON GOING HOUSES UNDER CONSTRUCTION. THEY ARE ALSO DOING MINOR UTILITY AND SITE WORK AROUND THE NEW HOMES AS NEEDED FOR FUTURE RELEASES, THIS MAY ALSO INCLUDE SIDEWALKS AND DRIVEWAYS.
05/14/2021 ENGR Grading Final DROBERTS Continued Entered by RSALDAT1 - CONTINUED. COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS, THIS WILL INCLUDE ALL LOTS, COMMON AREAS, AND DRAINAGE WAYS. ENSURE THAT ALL COMMON AREAS HAVE BEEN HYDROSEEDED WITH A NATIVE PLANT MIX IF DG HAS NOT BEEN PLACED OVER DISTURBED AREAS.
04/26/2021 ENGR Grading Final DROBERTS Continued Entered by RSALDAT1 - CONTINUED, VERTICAL WORK ON HOMES AT THIS TIME
03/04/2021 ENGR Grading Final DROBERTS Continued Entered by VLEON1 - CONTINUED AT THIS SITE. THE CLEARING OF THE GRADE FOR VEGETATION IS BEING DONE BY THE CONTRACTOR. PILES OF OLD MATERIAL AND VEGETATION ARE BEING CREATED, THESE WILL EITHER BE REMOVED OR MULCHED AT A LATER DATE.
10/30/2020 ENGR Grading Final DROBERTS Continued Entered by PAHUMAD1 - GRADING INTERMEDIATE IS CONTINUED AT THIS TIME, CREWS WORKING ON LANDSCAPING ITEMS IN AREAS WHERE THEY WILL BE SEEKING A TCO IN THE FUTURE. ALL OTHER WORK ON THIS SITE MAINLY CONTINUES ONTHE REMAINING STRUCTURES GOING VERTICAL.
10/16/2020 ENGR Grading Final DROBERTS Partial Approval Entered by JSCHNEI2 - PARTIAL AT THIS TIME, ROADWAYS HAVE BEEN CONSTRUCTED THROUGHOUT, SO LOT RELEASES WILL BE AVAILABLE IN THE NEAR FUTURE.
10/02/2020 ENGR Grading Final DROBERTS Continued Entered by JSCHNEI2 - CONTINUED AT THIS TIME, CREWS WORKING ON HOME CONSTRUCTION ANS INSTALLATION OF VERTICAL CURB AT THE NORTH WEST CORNER OF THE SITE.
09/18/2020 ENGR Grading Final RLEDONNE Continued Entered by JSCHNEI2 - Continue. Working on site walls and houses.
09/04/2020 ENGR Grading Final RLEDONNE Continued Entered by JSCHNEI2 - Continue. Working on houses.
07/10/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Working on riprap In drainage channels. Working on grading for streets getting ready for paving and sidewalks scuppers.
06/26/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continue. Working on grading roads installing curbs culverts and Street and rip rap and drainage.
05/29/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Working on grouted riprap in drainage and precast culverts for Rodeway Inn over drainage. Appear to be working on site wall.
05/15/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Working on grading pads. Working in right away. And in drainage area.
05/01/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Installing welded wire and grouted riprap in drainage on South east side of s i t e.
01/10/2020 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Appear to be starting on site utilities site sewer.
12/27/2019 ENGR Grading Final DROBERTS Continued Entered by DMERANZ1 - THE WORK AT THIS TIME CONSIST OF THE CONTRACTOR INSTALLING THE UNDERGROUND UTILITIES. MINOR TRACK OUT NOTED AT THIS TIME THAT WILL NEED TO BE ADDRESSED NEXT WEEK.
12/13/2019 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 - Working on grading streets.
11/15/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Working on rough grading at this time.
10/18/2019 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by DMERANZ1 - Grading work with no controls in place.
08/26/2019 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by DMERANZ1 - No activity at this time.
12/30/2019 ENGR Grading Final DROBERTS Continued Entered by DMERANZ1 - THE FOLLOWING WORK IS BEING DONE AT THIS TIME: GENERAL SITE GRADING FOR THE LOTS AND THE ROADWAYS. THIS SITE NEEDS TO BE CHECKED TOO SEE IF THE CONTRACTOR IS CALLING IN FOR HIS INSPECTIONS.
01/19/2023 ENGR Grading Final Complete (Recurring) This part of the subdivision is about 98% completed
01/19/2023 ENGR Grading Final Partial Pass This part of the submit subdivision is about 98% completed it
02/03/2023 ENGR Grading Final Complete (Recurring) Complete all work is shown on the approved plans on this prior to calling him for final inspection
02/03/2023 ENGR Grading Final Complete (Recurring) Complete I’ll work on this site prior to calling this in for a final inspection
05/04/2023 ENGR Grading Final Not Ready Sidewalk inspection needs to be completed prior to finalizing this inspection
08/04/2023 ENGR Grading Final Not Ready Complete starting the Vertical Construction on all open lots prior to scheduling this inspection. Also provide this Department with the Notice of Termination Letter from the Arizona Department of Environmental Quality prior to scheduling future Inspections.
08/04/2023 ENGR Grading Final Not Ready Complete starting the Vertical Construction on all open lots prior to scheduling this inspection. Also provide this Department with the Notice of Termination Letter from the Arizona Department of Environmental Quality prior to scheduling future Inspections.
10/05/2023 ENGR Grading Final Not Ready Three Lots still have not been constructed done so the site cannot be closed at this time. Provide this department, the notice of termination from the Arizona Department of Environmental Quality for this permit if it has been closed out by ADEQ. The sidewalks will have to be poured and completed as shown on the approved plans if this site is needed to be closed for the Development Package. Also, the open lots will have to be covered with 2 inches of decompose granite to close this permit, or the permit will stay open till the houses have been constructed on these three Lot
10/05/2023 ENGR Grading Final Not Ready Three Lots still have not been constructed done so the site cannot be closed at this time. Provide this department, the notice of termination from the Arizona Department of Environmental Quality for this permit if it has been closed out by ADEQ. The sidewalks will have to be poured and completed as shown on the approved plans if this site is needed to be closed for the Development Package. Also, the open lots will have to be covered with 2 inches of decompose granite to close this permit, or the permit will stay open till the houses have been constructed on these three Lot
10/27/2023 ENGR Grading Final Not Ready Complete this site as shown on the approved plans prior to calling this Inspection in again for another Grading Inspection.
10/27/2023 ENGR Grading Final Not Ready Complete this site as shown on the approved plans prior to calling this Inspection in again for another Grading Inspection.
10/28/2022 ENGR Grading Final Partial Pass