Permit: DP19-0050

Parcel: 141363370

Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final Not Ready
10/27/2022 ENGR Engineering Final Not Ready
01/06/2023 ENGR Engineering Final Complete (Recurring) Standing water, mud present
01/20/2023 ENGR Engineering Final Not Ready Complete all work on the site per the approved plans prior to calling in for the final
01/20/2023 ENGR Engineering Final Not Ready Complete I’ll work on the side and showing on the approved plans prior to calling this in for a final
02/03/2023 ENGR Engineering Final Complete (Recurring) Complete all work on the site prior to calling this inspection in for a final
02/03/2023 ENGR Engineering Final Complete (Recurring) Complete all work on this site prior to calling this inspection In for a final
05/01/2023 ENGR Engineering Final Partial Pass Complete all work as shown on the approved plans prior to scheduling this site for a final. This will include all landscaping for the site That may be included on DP17-0037. This site will be rescheduled for a sidewalk inspection for May 4 to be done by David Roberts. After that inspection, it will be determined what punchlist items will be needed and required prior to the full approval on this site.
05/01/2023 ENGR Engineering Final Partial Pass Complete all work as shown on the approved plans prior to scheduling this site for a final. This will include all landscaping for the site That may be included on DP17-0037. This site will be rescheduled for a sidewalk inspection for May 4 to be done by David Roberts. After that inspection, it will be determined what punchlist items will be needed and required prior to the full approval on this site.
08/04/2023 ENGR Engineering Final Not Ready COMPLETE THE STARTING OF ALL VERTICAL CONSTRUCTION FOR ALL LOTS, AND COMPLETE THE SIDEWALK CONSTRUCTION AS REQUIRED. FINAL INSPECTION OF SIDEWALKS WILL BE DONE THIS NEXT WEEK. PROVIDE THIS OFFICE WITH THE NOTICE OF TERMINATION LETTER FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY FOR THIS SITE.
08/04/2023 ENGR Engineering Final Passed
10/05/2023 ENGR Engineering Final Not Ready Three Lots still have not been constructed done so the site cannot be closed at this time. Provide this department, the notice of termination from the Arizona Department of Environmental Quality for this permit if it has been closed out by ADEQ. The sidewalks will have to be poured and completed as shown on the approved plans if this site is needed to be closed for the Development Package. Also, the open lots will have to be covered with 2 inches of decompose granite to close this permit, or the permit will stay open till the houses have been constructed on these three Lot
10/27/2023 ENGR Engineering Final Passed