Permit: DP19-0041

Parcel: Unknown


Addresses:

5720 E BROADWAY BL

Inspection Status: Passed

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
04/01/2020 ENGR Grading Final RLEDONNE Approved Entered by SFLORES2 -
04/01/2020 ENGR Grading Final RLEDONNE Approved Entered by SFLORES2 -
04/01/2020 ENGR Grading Final RLEDONNE Approved Entered by SFLORES2 -
04/01/2020 ENGR Grading Final RLEDONNE Approved Entered by SFLORES2 -
02/27/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 - Rebar in walls for trash enclosure OK
02/27/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 - Rebar in walls for trash enclosure OK
02/27/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 - Rebar in walls for trash enclosure OK
02/27/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 - Rebar in walls for trash enclosure OK
02/24/2020 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by SFLORES2 -
02/24/2020 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by SFLORES2 -
02/24/2020 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by SFLORES2 -
02/24/2020 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by SFLORES2 -
02/14/2020 ENGR Grading Final DROBERTS Continued Entered by SFLORES2 - AT THIS TIME FOR THE POURING OF THE FIRST 4 FEET OF GROUT FOR THE TRASH ENCLOSURE WALLS.
02/14/2020 ENGR Grading Final DROBERTS Continued Entered by SFLORES2 - AT THIS TIME FOR THE POURING OF THE FIRST 4 FEET OF GROUT FOR THE TRASH ENCLOSURE WALLS.
02/14/2020 ENGR Grading Final DROBERTS Continued Entered by SFLORES2 - AT THIS TIME FOR THE POURING OF THE FIRST 4 FEET OF GROUT FOR THE TRASH ENCLOSURE WALLS.
01/27/2020 ENGR Grading Final RLEDONNE Partial Approval Entered by DMERANZ1 - Footers for trash enclosure per plans.
11/04/2019 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by DMERANZ1 -
09/26/2019 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by DMERANZ1 - No message. No activity on site.
06/23/2020 ENGR Grading Final RLEDONNE Approved Entered by RSALDAT1 - Approved.
04/01/2020 ENGR Grading Final BBENEDON Partial Approval Entered by SFLORES2 - Trash enclosure footing. Video inspection with Chris.
02/27/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 -
02/27/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 -
02/27/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 -
02/27/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 -
11/04/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - working on footer for building.
09/10/2019 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by DMERANZ1 - No one is working on site at this time.
06/23/2020 ENGR Grading Final RLEDONNE Approved Entered by RSALDAT1 - Approved.
04/02/2020 ENGR Grading Final RLEDONNE Continued Entered by VFLORES1 - CHECK SIDEWALKS AROUND BUILDING AND UP TO TRASH ENCLOSURE
03/27/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 - Met with GC went over sidewalk across slopes and running slopes
03/27/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 - Met with GC went over sidewalk across slopes and running slopes
03/27/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 - Met with GC went over sidewalk across slopes and running slopes.
03/27/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 - Met with GC went over sidewalk across slopes and running slopes
03/25/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 - Met with GC on site went over accessible parking and ramp and handrail to trashing closure.
03/25/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 - Met with GC on site went over accessible parking and ramp and handrail to trashing closure.
03/25/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 - Met with GC on site went over accessible parking and ramp and handrail to trashing closure.
03/25/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 - Met with GC on site went over accessible parking and ramp and handrail to trashing closure.
03/04/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 - Walk site with GC went over grading plans.
03/04/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 - Walk site with GC went over grading plans.
03/04/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 - Walk site with GC went over grading plans.
03/04/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 - Walk site with GC went over grading plans.
02/27/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 - Went over curb openings at basins and drive through turn radius. Recommended to get with engineer of record.
02/27/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 - Went over curb openings at basins and drive through turn radius. Recommended to get with engineer of record.
02/27/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 - Went over curb openings at basins and drive through turn radius. Recommended to get with engineer of record.
02/27/2020 ENGR Grading Final RLEDONNE Continued Entered by SFLORES2 - Continue. Went over curb openings at basins and drive through turn radius. Recommended to get with engineer of record.
02/19/2020 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Met with GC on site went over approved plans.
11/04/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Working on building footer.
06/23/2020 ENGR Grading Final RLEDONNE Approved Entered by RSALDAT1 - Approved.
04/07/2020 ENGR Grading Final RLEDONNE Continued Entered by VFLORES1 - Leave open until final.
02/14/2020 ENGR Grading Final DROBERTS Continued Entered by SFLORES2 - AT THIS TIME. I WALKED THE SITE WITH RENE AND DISCUSSED WHAT WORK THEY WILL BE DOING OVER THE NEXT FEW WEEKS. HE IS HOPING TO HAVE ENOUGH WORK COMPLETED SO THA HE WOULD BE ABLE TO SCHEDULE A TCO INSPECTION. WE DISCUSSED THE DRAINAGE AND THE ADA AREAS MUST BE IN COMPLIANCE PRIOR TO THE FULL APPROVAL FOR THE COMBO AND DEVELOPMENT PACKAGES FOR THIS SITE. RENE WILL BE SCHEDULING ADDITIONAL SITE INSPECTIONS OVER THE NEXT FEW WEEKS TO MAKE SURE WE LOOKED AT EVERYTHING.
02/14/2020 ENGR Grading Final DROBERTS Continued Entered by SFLORES2 - AT THIS TIME. I WALKED THE SITE WITH RENE AND DISCUSSED WHAT WORK THEY WILL BE DOING OVER THE NEXT FEW WEEKS. HE IS HOPING TO HAVE ENOUGH WORK COMPLETED SO THA HE WOULD BE ABLE TO SCHEDULE A TCO INSPECTION. WE DISCUSSED THE DRAINAGE AND THE ADA AREAS MUST BE IN COMPLIANCE PRIOR TO THE FULL APPROVAL FOR THE COMBO AND DEVELOPMENT PACKAGES FOR THIS SITE. RENE WILL BE SCHEDULING ADDITIONAL SITE INSPECTIONS OVER THE NEXT FEW WEEKS TO MAKE SURE WE LOOKED AT EVERYTHING.
02/14/2020 ENGR Grading Final DROBERTS Continued Entered by SFLORES2 - AT THIS TIME. I WALKED THE SITE WITH RENE AND DISCUSSED WHAT WORK THEY WILL BE DOING OVER THE NEXT FEW WEEKS. HE IS HOPING TO HAVE ENOUGH WORK COMPLETED SO THA HE WOULD BE ABLE TO SCHEDULE A TCO INSPECTION. WE DISCUSSED THE DRAINAGE AND THE ADA AREAS MUST BE IN COMPLIANCE PRIOR TO THE FULL APPROVAL FOR THE COMBO AND DEVELOPMENT PACKAGES FOR THIS SITE. RENE WILL BE SCHEDULING ADDITIONAL SITE INSPECTIONS OVER THE NEXT FEW WEEKS TO MAKE SURE WE LOOKED AT EVERYTHING.
11/04/2019 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by DMERANZ1 -