Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 11/25/2019 |
PDSD Engineering Division Pre-Construction SITE |
RLEDONNE |
Approved |
Entered by DMERANZ1 - |
| 07/19/2019 |
PDSD Engineering Division Pre-Construction SITE |
RLEDONNE |
Continued |
Entered by VFLORES1 - Met with general contractor on site went over accessible parking and pathways that were over 2% or over 8.3% on the run. And to providePhysical separation on pathways. Any change to approve the plans need to provide revisions. City of Tucson approve. |