Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 07/08/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 06/27/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Not ready. Call for inspections under your development package permit for the inspection of this work. Note this was a courtesy inspection, Contractor requested inspection of combination permit only. Complete all the work shown on the development package plan. Do you press the area within the curved separator as shown on your plan. |
| 07/08/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 06/27/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Not ready. Call for inspections under your development package permit for the inspection of this work. Note this was a courtesy inspection, Contractor requested inspection of combination permit only. Complete all the work shown on the development package plan. Do you press the area within the curved separator as shown on your plan. |