Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 05/17/2022 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by RSALDAT1 - APPROVED |
| 05/20/2022 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by RSALDAT1 - PARTIAL PROVIDE A STAMPED AND SEALED CERTIFICATION LETTER FROM THE ENGINEER OF RECORD STATING THAT ALL WORK ON THIS SITE HAS BEEN COMPLETED PER THE APPROVED PLANS. NONE OF THIS WORK WAS INSPECTED THROUGHOUT THE CONSTRUCTION PHASE. |
| 02/03/2023 |
ENGR Engineering Final
|
|
Passed |
N/A |
| 02/03/2023 |
ENGR Engineering Final
|
|
Passed |
N/A |