Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP19-0015
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/06/2022 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
10/26/2020 | ENGR Grading Final | Rledonne | Approved | Entered by RLEDONN1 - |
10/26/2020 | ENGR Grading Final | Rledonne | Approved | Entered by RLEDONN1 - |
10/26/2020 | ENGR Grading Final | Rledonne | Approved | Entered by RLEDONN1 - |
10/26/2020 | ENGR Grading Final | Rledonne | Approved | Entered by RLEDONN1 - |
10/21/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Check sidewalks all good within 2% except For north side of North entrance too much debris on sidewalks to check went over with Bailey everything that needs to be completed for TCO. |
09/16/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue. Working on parking structure and then right away. |
09/16/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue. Working on parking structure and then right away. |
09/09/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue checked sidewalk slopes inspection per highlights on page C6.1. |
09/09/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue checked sidewalk slopes inspection per highlights on page C6.1. |
08/13/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Inspection per highlight plan set. Page C6.1. Sidewalk inspections. |
07/29/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Working on final grading for parking areas on north side of building and installing curves at entrance. |
07/29/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Working on final grading for parking areas on north side of building and installing curves at entrance. |
06/29/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Walk site with John GC went over things that were covered without inspection. Under ground retention detention basin on north side of site. Trashing closure and stormwater piping. Talked with him about supplying certification letter from engineer of record for all grading and drainage. And trashing closure covered without inspections rebar and footers.Went over work to complete for TCO. Went over sidewalks curb openings ADA parking curbs ramps . and basins. |
06/29/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Walk site with John GC went over things that were covered without inspection. Under ground retention detention basin on north side of site. Trashing closure and stormwater piping. Talked with him about supplying certification letter from engineer of record for all grading and drainage. And trashing closure covered without inspections rebar and footers.Went over work to complete for TCO. Went over sidewalks curb openings ADA parking curbs ramps . and basins. |
06/17/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Walk site working on spreading AB On south side of building also working on concrete swale in middle of parking area. John unable to meet got stuck in meeting. Suggested maybe call back for next week for any questions that he has. |
06/17/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Walk site working on spreading AB On south side of building also working on concrete swale in middle of parking area. John unable to meet got stuck in meeting. Suggested maybe call back for next week for any questions that he has. |