Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP19-0015

Parcel: 128100570


Addresses:

251 S WILLIAMS BL


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP19-0015

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
04/06/2022 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
10/26/2020 ENGR Grading Final Rledonne Approved Entered by RLEDONN1 -
10/26/2020 ENGR Grading Final Rledonne Approved Entered by RLEDONN1 -
10/26/2020 ENGR Grading Final Rledonne Approved Entered by RLEDONN1 -
10/26/2020 ENGR Grading Final Rledonne Approved Entered by RLEDONN1 -
10/21/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Check sidewalks all good within 2% except For north side of North entrance too much debris on sidewalks to check went over with Bailey everything that needs to be completed for TCO.
09/16/2020 ENGR Grading Final RLEDONNE Continued Entered by JSCHNEI2 - Continue. Working on parking structure and then right away.
09/16/2020 ENGR Grading Final RLEDONNE Continued Entered by JSCHNEI2 - Continue. Working on parking structure and then right away.
09/09/2020 ENGR Grading Final RLEDONNE Continued Entered by JSCHNEI2 - Continue checked sidewalk slopes inspection per highlights on page C6.1.
09/09/2020 ENGR Grading Final RLEDONNE Continued Entered by JSCHNEI2 - Continue checked sidewalk slopes inspection per highlights on page C6.1.
08/13/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Inspection per highlight plan set. Page C6.1. Sidewalk inspections.
07/29/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Working on final grading for parking areas on north side of building and installing curves at entrance.
07/29/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Working on final grading for parking areas on north side of building and installing curves at entrance.
06/29/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Walk site with John GC went over things that were covered without inspection. Under ground retention detention basin on north side of site. Trashing closure and stormwater piping. Talked with him about supplying certification letter from engineer of record for all grading and drainage. And trashing closure covered without inspections rebar and footers.Went over work to complete for TCO. Went over sidewalks curb openings ADA parking curbs ramps . and basins.
06/29/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Walk site with John GC went over things that were covered without inspection. Under ground retention detention basin on north side of site. Trashing closure and stormwater piping. Talked with him about supplying certification letter from engineer of record for all grading and drainage. And trashing closure covered without inspections rebar and footers.Went over work to complete for TCO. Went over sidewalks curb openings ADA parking curbs ramps . and basins.
06/17/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Walk site working on spreading AB On south side of building also working on concrete swale in middle of parking area. John unable to meet got stuck in meeting. Suggested maybe call back for next week for any questions that he has.
06/17/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Walk site working on spreading AB On south side of building also working on concrete swale in middle of parking area. John unable to meet got stuck in meeting. Suggested maybe call back for next week for any questions that he has.