Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP19-0015
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/06/2022 | ENGR Engineering Final | DROBERTS | Approved | Entered by DROBERT5 - |
10/26/2020 | ENGR Engineering Final | RDELONNE | Partial Approval | Entered by PAHUMAD1 - Partial approval. OK for TCO engineering only. Complete all work on on approved plans keynotes and provide all certain letters and As requested in past inspections notes. |
03/21/2019 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by CBELL1 - I have asked the contractors to call in Inspection 9150 Engineering Pre-con in for next Monday. Also the contractor has been advised to call in Inspection 09154 Stormwater Followup Every two weeks till the project has all the pavement and asphalt down. |
10/26/2020 | ENGR Engineering Final | Rledonne | Approved | Entered by RLEDONN1 - |