Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP19-0013
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/20/2019 | ENGR Grading Final | RLEDONNE | Approved | Entered by SFLORES2 - |
12/20/2019 | ENGR Grading Final | RLEDONNE | Approved | Entered by SFLORES2 - |
08/14/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Trash enclosure slab and bollards are OK. Terry with Pate construction only works until 230. |
08/01/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - vertical rebar in the wall for trash enclosure and bond beam OK |
07/12/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Rebar in footer for trash Enclosure per city details. |
04/29/2019 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by CBELL1 - gave hand out for trash enclosureDetail on approved plans not per city standards |
12/20/2019 | ENGR Grading Final | RLEDONNE | Approved | Entered by SFLORES2 - |
11/12/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Walk site with GC went over ramps That’s slopes were out. |
08/14/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Trash enclosure slab and bollards are OK. Terry with Pate construction only works until 230. |
12/20/2019 | ENGR Grading Final | RLEDONNE | Approved | Entered by SFLORES2 - |
11/12/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Working on building and parking area. |