Permit: DP19-0013

Parcel: 136156150

Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP19-0013

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
12/20/2019 ENGR Grading Final RLEDONNE Approved Entered by SFLORES2 -
12/20/2019 ENGR Grading Final RLEDONNE Approved Entered by SFLORES2 -
08/14/2019 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Trash enclosure slab and bollards are OK. Terry with Pate construction only works until 230.
08/01/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - vertical rebar in the wall for trash enclosure and bond beam OK
07/12/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Rebar in footer for trash Enclosure per city details.
04/29/2019 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by CBELL1 - gave hand out for trash enclosureDetail on approved plans not per city standards
12/20/2019 ENGR Grading Final RLEDONNE Approved Entered by SFLORES2 -
11/12/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Walk site with GC went over ramps That’s slopes were out.
08/14/2019 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Trash enclosure slab and bollards are OK. Terry with Pate construction only works until 230.
12/20/2019 ENGR Grading Final RLEDONNE Approved Entered by SFLORES2 -
11/12/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Working on building and parking area.