Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP19-0013

Parcel: Unknown

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
01/14/2020 ENGR Engineering Final RLEDONNE Approved Entered by DMERANZ1 -
12/20/2019 ENGR Engineering Final RLEDONNE Partial Approval Entered by SFLORES2 - er notes engineering final.
12/16/2019 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by DMERANZ1 - Went over with GC work and certification letters for final.
01/14/2020 ENGR Engineering Final RLEDONNE Approved Entered by DMERANZ1 -
12/20/2019 ENGR Engineering Final RLEDONNE Partial Approval Entered by SFLORES2 - OK for TCO. Walk site with GC went over items that needed to be completed for final. Ballard‘s on east side of site riprap installed per approved plans pin backs for trash enclosures. CERT letter from engineer of record on site GC has.