Permit: DP19-0002

Parcel: 107111790


Addresses:

123 W DELANO ST


Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP19-0002

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
05/02/2019 ENGR Engineering Final BBENEDON Approved Entered by CBELL1 -
05/02/2019 ENGR Engineering Final BBENEDON Approved Entered by CBELL1 - Please final any other open engineering categories for this development package. OK to final permit have other inspections have been completed
04/16/2019 ENGR Engineering Final BBENEDON Partial Approval Entered by CMURPHY1 - Remove excess of concrete and asphalt and two large boulders from the parking spaces next to the gate. Suggest curb stops rather than boulders. Reschedule for inspection when ready. No plans or contractor necessary for final approval.
04/12/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 - I left a message for Dustin at 8:08768 to 12:18 PM. Left site at 1:15 PM. No contractor on site, no plans or permits on site, no description of work on the permit. It appears that two new gates have been installed as well as some riprap. Complete the work. Remove spilled concrete and other construction debris. Remove large boulders from parking area. Provide plans.