Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP18-0315
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/27/2019 | ENGR Engineering Final | BBENEDON | Approved | Entered by DMERANZ1 - |
10/25/2019 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - Correct accessible parking sign. Complete The work shown in plan keynotes 23 and 25, also referenced in site data note numbers four, five and six, also referenced in lot number two Parking calculations. |