Date Description Inspector Results Comments
10/26/2022 PDSD Engineering Division Pre-Construction SITE Not Ready
03/02/2021 PDSD Engineering Division Pre-Construction SITE BBENEDON Partial Approval Entered by VLEON1 - partially approved. Mark with DR Horton. at 730-1781. Site contractor dirt works, SWPPP contractor earthworks. Provide signage, Stormwater controls, and schedule regular inspections for Stormwater and site progress.
02/25/2021 PDSD Engineering Division Pre-Construction SITE DROBERTS Partial Approval Entered by RSALDAT1 - S PARTIAL AT THIS TIME. I MET WITH THE DEVELOPER/CONTRACTR ND DISCUSSED IN DETAIL WHAT WILL BE HAPENNG ON THIS SITE AND OUR CONCERNS.THEY WILL BE CALLING THI INSPECTION IN AGAIN TO MEET WITH US ONCE THEY ARE BEGINNING TO START THE WORK.
06/02/2023 PDSD Engineering Division Pre-Construction SITE Passed contractor shall schedule Stormwater follow up inspections as previously requested.