Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/02/2022 | SITE - Stormwater Setup and Controls | BBENEDON | Continued | Entered by VVERA1 - Continued. North and east slopes of pad buildup remain unstabilized minor erosion. Silt fencing along northern portion of site remains in tact |
01/27/2022 | SITE - Stormwater Setup and Controls | BBENEDON | Continued | Entered by VVERA1 - Continue. SWPPPNOI information obtained and sent to Dave. |
08/19/2021 | SITE - Stormwater Setup and Controls | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Silt fence installed along north site perimeter. |
08/11/2021 | SITE - Stormwater Setup and Controls | BBENEDON | Partial Approval | Entered by NGARCIA3 - Partially approved. Additional track out rock installed as well as concrete containment |
08/05/2021 | SITE - Stormwater Setup and Controls | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Track out rock added. Concrete containment provided |
07/29/2021 | SITE - Stormwater Setup and Controls | BBENEDONEZ | Denied | Entered by RSALDAT1 - Denied. Track out rock is all but gone and needs to be redone. |
04/13/2021 | SITE - Stormwater Setup and Controls | BBENEDON | Continued | Entered by VLEON1 - Continued. Material expediting in progress. Rough grading. Minor track out noted on Silverbell, protections in place. |
03/24/2021 | SITE - Stormwater Setup and Controls | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Track out protection rock has been installed. |