Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP18-0286

Parcel: 99999999A

Inspection Status: Not Ready

Inspection History: SITE - Stormwater Final Inspection

Permit Number - DP18-0286

Inspection Description - SITE - Stormwater Final Inspection

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/26/2022 SITE - Stormwater Final Inspection Not Ready
01/25/2024 SITE - Stormwater Final Inspection Partial Pass
03/21/2024 SITE - Stormwater Final Inspection Not Ready Mark with DR Horton.
Correct erosion on all exposed slopes with obvious erosion. Remove all temporary stormwater controls and construction debris within and around site. Provide notice of termination for SWPPP permit. Schedule remaining inspections as required.
04/25/2024 SITE - Stormwater Final Inspection Partial Pass provide NOT, remove remaining portion of silt fencing. Construction debris, plastic from catch basin.
05/10/2024 SITE - Stormwater Final Inspection Passed
10/19/2023 SITE - Stormwater Final Inspection Not Ready erosion noted on East site bank and in south basin. Construction debris noted in utility easement east of subdivision.
11/30/2023 SITE - Stormwater Final Inspection Re-inspection required Correct areas with erosion. Remove all remaining construction debris and temporary Stormwater controls. Provide notice of termination for SWPPP.