Permit: DP18-0286

Parcel: 99999999A

Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Permit Number - DP18-0286

Inspection Description - ENGR Grading Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
05/20/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Utility work mostly complete. No other activity on site at this time.
10/20/2021 ENGR Grading Final BBENEDON Continued Entered by VVERA1 - Continue. Still no activity on site. It appears Construction has halted. Material stock piles remain on site.
03/09/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - CONTINUE PROJECT GRADING HAS STARTED, RECEIVED PLANS TODAY
07/27/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - 09181, 09185. Continued. Contractor starting bank protection at Southern, upper end. 24 inch footing has been dug a base of embankment.
07/26/2021 ENGR Grading Final MHERNANDEZ Continued Entered by RSALDAT1 - CN/ CREW IS MUCKING OUT THE MUD FROM THE FOOTER. INFORMED THEM THAT THEY NEED A SET OF PLANS 0N SITE AT ALL TIMES.
07/23/2021 ENGR Grading Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready due to rain. Deacon 241-1415. 2 foot toe down parallel to Silverbell Road 500 feet. Ensure sufficient soil conditions and document with photos and recall for inspection.
09/15/2022 ENGR Grading Final BBENEDON Partial Approval Entered by NGARCIA3 - Partially approved paving
07/28/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Curb installations
07/14/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued Curb installations
06/30/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Grading and material export.
06/16/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued 3390 N. SilverBell
06/16/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued, Grading activity. No progress on bank protection since work stopped 3390 N Silverbell Rd
06/10/2022 ENGR Grading Final BBENEDON Continued Entered by VVERA1 - Continued. Grading
06/01/2022 ENGR Grading Final BBENEDONE Continued Entered by VVERA1 - Continued. Grading
05/27/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Water truck on site no other activity at this time
04/29/2022 ENGR Grading Final BBENEDON Continued Entered by VVERA1 - Continued. Water sewer and electric utility mains have been installed
04/22/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Utility work
04/19/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued
04/13/2022 ENGR Grading Final BBENEDON Continued Entered by VVERA1 - Continued. Grading
04/06/2022 ENGR Grading Final BBENEDON Continued Entered by VVERA1 - Continue. Electrical utility work
03/31/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. No activity on site on this day. Utility work appears to be mostly complete.
03/25/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. electrical utility work
03/09/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Electrical utility work in progress
01/25/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Utility work in progress. Bank protection work has not restarted. Erosion of unprotected slopes noted.
01/13/2022 ENGR Grading Final BBENEDON Continued Entered by VVERA1 - Continued. Water and sewer utility work in progress
01/06/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Utility work in progress
12/15/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. No activity on site at this time
11/16/2021 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Riprap embankment work has stopped at Northwest corner. 339O N Silverbell Rd
11/02/2021 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continue. No additional activity on site at this time
10/27/2021 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - . Continued. No activity at this time. Progress stalled
09/29/2021 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - . Continued. No activity on site no change since last inspection
09/01/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. No activity on site after rain event. Minor erosion of Built up pad sides.
08/27/2021 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. No activity on site on this date.
08/25/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. No progress at north end of bank protection
08/17/2021 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. No new progress on bank protection. Rain delay
08/10/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. No activity on site due to rain
08/05/2021 ENGR Grading Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Continued progress on grouted riprap bank protection.
08/04/2021 ENGR Grading Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Grouted riprap bank protection
07/29/2021 ENGR Grading Final BBENEDONEZ Continued Entered by RSALDAT1 - Continued. Bank reinforcement/grouted riprap.
07/27/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - 09181, 09185. Continued. Contractor starting bank protection at Southern, upper end. 24 inch footing has been dug a base of embankment.
07/20/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Erosion prevalent in newly graded basin and pads
06/25/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Contractor working on stabilizing bank of new build up. No utility work has started at this time
06/03/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Rough grading and basin.
05/26/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - CONTINUE ROUGH GRADING
04/30/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continue. Ongoing material transfer onto the site. No track out issues at this time. Street sweeper in use twice a day. Water truck in use. Check with dirt works 237-7522
04/16/2021 ENGR Grading Final DROBERTS Continued Entered by VLEON1 - CONTINUED AT THIS TIME. THE HAULING OF MATERIAL CONTINUES ON THIS SITE FROM OTHER LOCATIONS AS WELL AS PROCESSING AND COMPACTING. NO DUST NOTED AT THIS TIME ON THE STOCK PILE BUT HAS BEEN NOTED IN ON AND ADJACENT TO SILVERBELL ROAD, SEE THE NOTES IN THE STORMWATER FOLLOW UP INSPECTION.
04/13/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Material expediting in progress. Rough grading. Minor track out noted on Silverbell, protections in place.
03/24/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Rough grading in progress. Basin has been cut.
03/08/2021 ENGR Grading Final DROBERTS Not ready for Inspection Entered by VLEON1 - CONTRACTOR IS WORKING ON PREPARING THE ROUGH GRADE FOR ADDITIONAL FILL MATERIAL. ALSO WORKIN ON THE WATER TIE-IN ON THE WEST SIDE OF SILVERBELL RD.
01/25/2024 ENGR Grading Final Passed
01/25/2024 ENGR Grading Final Passed
06/02/2023 ENGR Grading Final Complete (Recurring)
06/28/2023 ENGR Grading Final Complete (Recurring)
07/05/2023 ENGR Grading Final Partial Pass
07/27/2023 ENGR Grading Final Partial Pass erosion noted on north and east banks of elevated site, as well as on the banks of the basins. Correct erosion and provide proper stabilization to prevent future occurrences prior to final acceptance of this project.
Project is on going at this time. Continue to provide stormwater controls in concrete containment as required.
08/10/2023 ENGR Grading Final Not Ready
10/19/2023 ENGR Grading Final Not Ready erosion noted on East site bank and in south basin. Construction debris noted in utility easement east of subdivision.
11/30/2023 ENGR Grading Final Re-inspection required correct erosion problems.
Remove construction debris from surrounding areas .
Stabilized all disturbed areas .