Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP18-0286
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
05/20/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Utility work mostly complete. No other activity on site at this time. |
10/20/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - Continue. Still no activity on site. It appears Construction has halted. Material stock piles remain on site. |
03/09/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by VLEON1 - CONTINUE PROJECT GRADING HAS STARTED, RECEIVED PLANS TODAY |
07/27/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - 09181, 09185. Continued. Contractor starting bank protection at Southern, upper end. 24 inch footing has been dug a base of embankment. |
07/26/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by RSALDAT1 - CN/ CREW IS MUCKING OUT THE MUD FROM THE FOOTER. INFORMED THEM THAT THEY NEED A SET OF PLANS 0N SITE AT ALL TIMES. |
07/23/2021 | ENGR Grading Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready due to rain. Deacon 241-1415. 2 foot toe down parallel to Silverbell Road 500 feet. Ensure sufficient soil conditions and document with photos and recall for inspection. |
09/15/2022 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by NGARCIA3 - Partially approved paving |
07/28/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Curb installations |
07/14/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued Curb installations |
06/30/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Grading and material export. |
06/16/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued 3390 N. SilverBell |
06/16/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued, Grading activity. No progress on bank protection since work stopped 3390 N Silverbell Rd |
06/10/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - Continued. Grading |
06/01/2022 | ENGR Grading Final | BBENEDONE | Continued | Entered by VVERA1 - Continued. Grading |
05/27/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Water truck on site no other activity at this time |
04/29/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - Continued. Water sewer and electric utility mains have been installed |
04/22/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Utility work |
04/19/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued |
04/13/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - Continued. Grading |
04/06/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - Continue. Electrical utility work |
03/31/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. No activity on site on this day. Utility work appears to be mostly complete. |
03/25/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. electrical utility work |
03/09/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Electrical utility work in progress |
01/25/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Utility work in progress. Bank protection work has not restarted. Erosion of unprotected slopes noted. |
01/13/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - Continued. Water and sewer utility work in progress |
01/06/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Utility work in progress |
12/15/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. No activity on site at this time |
11/16/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Riprap embankment work has stopped at Northwest corner. 339O N Silverbell Rd |
11/02/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continue. No additional activity on site at this time |
10/27/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - . Continued. No activity at this time. Progress stalled |
09/29/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - . Continued. No activity on site no change since last inspection |
09/01/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. No activity on site after rain event. Minor erosion of Built up pad sides. |
08/27/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. No activity on site on this date. |
08/25/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. No progress at north end of bank protection |
08/17/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. No new progress on bank protection. Rain delay |
08/10/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. No activity on site due to rain |
08/05/2021 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Continued progress on grouted riprap bank protection. |
08/04/2021 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Grouted riprap bank protection |
07/29/2021 | ENGR Grading Final | BBENEDONEZ | Continued | Entered by RSALDAT1 - Continued. Bank reinforcement/grouted riprap. |
07/27/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - 09181, 09185. Continued. Contractor starting bank protection at Southern, upper end. 24 inch footing has been dug a base of embankment. |
07/20/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Erosion prevalent in newly graded basin and pads |
06/25/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by VLEON1 - Continued. Contractor working on stabilizing bank of new build up. No utility work has started at this time |
06/03/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by VLEON1 - Continued. Rough grading and basin. |
05/26/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by VLEON1 - CONTINUE ROUGH GRADING |
04/30/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by VLEON1 - Continue. Ongoing material transfer onto the site. No track out issues at this time. Street sweeper in use twice a day. Water truck in use. Check with dirt works 237-7522 |
04/16/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - CONTINUED AT THIS TIME. THE HAULING OF MATERIAL CONTINUES ON THIS SITE FROM OTHER LOCATIONS AS WELL AS PROCESSING AND COMPACTING. NO DUST NOTED AT THIS TIME ON THE STOCK PILE BUT HAS BEEN NOTED IN ON AND ADJACENT TO SILVERBELL ROAD, SEE THE NOTES IN THE STORMWATER FOLLOW UP INSPECTION. |
04/13/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by VLEON1 - Continued. Material expediting in progress. Rough grading. Minor track out noted on Silverbell, protections in place. |
03/24/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Rough grading in progress. Basin has been cut. |
03/08/2021 | ENGR Grading Final | DROBERTS | Not ready for Inspection | Entered by VLEON1 - CONTRACTOR IS WORKING ON PREPARING THE ROUGH GRADE FOR ADDITIONAL FILL MATERIAL. ALSO WORKIN ON THE WATER TIE-IN ON THE WEST SIDE OF SILVERBELL RD. |
01/25/2024 | ENGR Grading Final | Passed | ||
01/25/2024 | ENGR Grading Final | Passed | ||
06/02/2023 | ENGR Grading Final | Complete (Recurring) | ||
06/28/2023 | ENGR Grading Final | Complete (Recurring) | ||
07/05/2023 | ENGR Grading Final | Partial Pass | ||
07/27/2023 | ENGR Grading Final | Partial Pass | erosion noted on north and east banks of elevated site, as well as on the banks of the basins. Correct erosion and provide proper stabilization to prevent future occurrences prior to final acceptance of this project. Project is on going at this time. Continue to provide stormwater controls in concrete containment as required. |
|
08/10/2023 | ENGR Grading Final | Not Ready | ||
10/19/2023 | ENGR Grading Final | Not Ready | erosion noted on East site bank and in south basin. Construction debris noted in utility easement east of subdivision. | |
11/30/2023 | ENGR Grading Final | Re-inspection required | correct erosion problems. Remove construction debris from surrounding areas . Stabilized all disturbed areas . |