Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP18-0286
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
10/27/2022 | ENGR Engineering Final | Not Ready | ||
01/25/2024 | ENGR Engineering Final | Passed | ||
01/26/2024 | ENGR Engineering Final | Partial Pass | Corrections required. See previously noted comments. Correct erosion, irrigation and stabilization on sloped banks and basins. Remove all construction debris accumulated around site especially to the east. Remove all abandoned Stormwater controls. | |
04/03/2024 | ENGR Engineering Final | Re-inspection required | No change of previously noted items other than overgrowth of weeds, especially in areas of uncontained irrigation leakage. | |
04/25/2024 | ENGR Engineering Final | Partial Pass | small amounts of construction debris and abandoned stormwater controls remain scattered around the site. minor erosion remains in a few places, exposing irrigation tubing. Replace dead or missing landscaping, and provide approved plans for final inspection. | |
05/10/2024 | ENGR Engineering Final | Passed |