Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP18-0272
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/10/2019 | ENGR Grading Final | BBENEDON | Approved | Entered by VFLORES1 - |
01/16/2019 | ENGR Grading Final | bbenedo1 | Continued | Entered by BBENEDO1 - Grading site, not site is higher than grade on silverlake, need to pay attention to potential pour off. waddle in place |
05/15/2019 | ENGR Grading Final | BBENEDON | Approved | Entered by DMERANZ1 - |
05/15/2019 | ENGR Grading Final | BBENEDON | Approved | Entered by DMERANZ1 - |
08/14/2019 | ENGR Grading Final | BBENEDON | Approved | Entered by DMERANZ1 - |
06/18/2019 | ENGR Grading Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - One accessible space requires correction. Sidewalks are OK. Provide revisions for all changes made including accessible routes. Rainwater may not train over accessible walkways. Bicycle parking has not been installed. The trashing closure is less than 6 feet tall and was not inspected by engineering. Provide a letter from your engineer stating that the enclosure was constructed in accordance with COT standard detail 6.01. Correct the doors that do not open fully, drill pinholes in concrete. Provide a letter certifying final grade. Install the missing trees and complete all landscaping. Clean all construction materials and debris’s. Complete installation of signs |
05/10/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by VFLORES1 - Contractor is installing curbs and grading site. |
04/22/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by CBELL1 - I informed Shane that our stormwater manholes may not say Pima county sewer. |
04/19/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by CBELL1 - Inlet and outlet pipes, catch basin and a manhole for underground basin in the east parking lot OK to cove |
04/18/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by CBELL1 - 96 inch galvanized basin has been installed in the northeast lot. Contractor is OK to begin backfill and basin and outlet pipe. |
04/16/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by CMURPHY1 - Contractor is grading the main job site and installing a below ground basin on the site immediately to the east. |
03/26/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by CBELL1 - RCP discharge pipes at below ground basins installed per latest revision March 7. OK to cover |
03/15/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by CBELL1 - Drainage piping downstream of underground basin’s OK to cover, catch basin upstream OK |
03/08/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by CBELL1 - Backfilling corrugated metal pipe basin on southside of sight. |
03/04/2019 | ENGR Grading Final | DROBERTS | Continued | Entered by CBELL1 - The contractor has installed is below grade Retention/Detention basins at the Southwest corner of the site. I have looked at this area and it is determined that they can proceed with the native backfill material on top of the bedding material up to Spring line. I have also looked at the 30 inch CMP Pipe. I have Inspected the concrete collars that been placed at the joining the intersections this areas is also approved for backfill material. |
02/28/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by CBELL1 - 24 inch underground storm connection to tanks per Pima county standard. Call for inspection when the filter fabric is put in place. |
02/25/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by CBELL1 - Three underground basins installed as shown per plan. |
02/22/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by CBELL1 - 60 feet of 24 inch underground OK. |
02/07/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by CBELL1 - Manhole and catch basin at south east corner of property with continuation of piping OK for cover |
02/07/2019 | ENGR Grading Final | BBENEDON | Cancelled | Entered by CBELL1 - Reschedule to Thursday due to rain |
02/06/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by CBELL1 - Connection of manhole outlet pipe on Eastern lot is OK. Mike with catamount constructors is the new superintendent on site 210-213 -0557 |
01/11/2019 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - CREWS ARE WORKING ON THE INSTALLATION OF HDPE AND CONSTRUCTING CATCH BASINS. I HAVE ASKED THE CONTRACTOR TO MARK ALL OF THE LINES ON THE PLANS AND WILL IGNITIAL THAT THEY HAVE BEEN APPROV ED. |