Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP18-0272
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/10/2019 | SITE - Stormwater Follow-up | BBENEDON | Approved | Entered by DMERANZ1 - |
06/18/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - Minor check out to be noted. |
05/15/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - There is some track out, there is a sweeper on site to manage track out as needed. |
04/22/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by CBELL1 - There is some track out coming from all site entrances, additionally the main site is utilizing a new entrance that has no track out protection. |
04/18/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by CBELL1 - Note there is some track out onto Fiandaca |
04/16/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by CMURPHY1 - No issues at this time however there is some minor track out. |
03/15/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by CBELL1 - There are no issues at this time but I did ask the GC to be for his track our protection |
03/08/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by CBELL1 - There are no issues at this time |
03/04/2019 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by CBELL1 - no concerns on site. The Contractor is monitoring the site during all work force actions and is controlling track up. |
02/28/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by CBELL1 - The streets have been swept there’sThere is no track out or issues at this time. |
02/25/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by CBELL1 - There’s quite a bit a track out due to local muddy conditions. |
02/07/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by CBELL1 - Some minor track out to be noted. My only concern at this time is along the north property line where dirt is piled up against the waddle and the side elevation is higher than the existing grade. Protect newly installed catch basins |
02/06/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by CBELL1 - the site is closed due to rate activity there are no issues at this time |
01/11/2019 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME, TRACK OUT NOTED BUT MINOR ONLY. |
01/16/2019 | SITE - Stormwater Follow-up | bbenedo1 | Continued | Entered by BBENEDO1 - Minor trackout noted. Grading site, not site is higher than grade on silverlake, need to pay attention to potential pour off. waddle in place |
12/31/2018 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by CBELL1 - Miner track out and present on Findaca Boulevard. Schedule inspections for your DP permit every two weeks. Schedule a pre-construction meeting if you have not yet done so |