Permit: DP18-0272

Parcel: 11811007B


Addresses:

709 W SILVERLAKE RD


Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP18-0272

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Passed

Date Description Inspector Results Comments
07/10/2019 SITE - Stormwater Follow-up BBENEDON Approved Entered by DMERANZ1 -
06/18/2019 SITE - Stormwater Follow-up BBENEDON Continued Entered by DMERANZ1 - Minor check out to be noted.
05/15/2019 SITE - Stormwater Follow-up BBENEDON Continued Entered by DMERANZ1 - There is some track out, there is a sweeper on site to manage track out as needed.
04/22/2019 SITE - Stormwater Follow-up BBENEDON Continued Entered by CBELL1 - There is some track out coming from all site entrances, additionally the main site is utilizing a new entrance that has no track out protection.
04/18/2019 SITE - Stormwater Follow-up BBENEDON Continued Entered by CBELL1 - Note there is some track out onto Fiandaca
04/16/2019 SITE - Stormwater Follow-up BBENEDON Continued Entered by CMURPHY1 - No issues at this time however there is some minor track out.
03/15/2019 SITE - Stormwater Follow-up BBENEDON Continued Entered by CBELL1 - There are no issues at this time but I did ask the GC to be for his track our protection
03/08/2019 SITE - Stormwater Follow-up BBENEDON Continued Entered by CBELL1 - There are no issues at this time
03/04/2019 SITE - Stormwater Follow-up DROBERTS Continued Entered by CBELL1 - no concerns on site. The Contractor is monitoring the site during all work force actions and is controlling track up.
02/28/2019 SITE - Stormwater Follow-up BBENEDON Continued Entered by CBELL1 - The streets have been swept there’sThere is no track out or issues at this time.
02/25/2019 SITE - Stormwater Follow-up BBENEDON Continued Entered by CBELL1 - There’s quite a bit a track out due to local muddy conditions.
02/07/2019 SITE - Stormwater Follow-up BBENEDON Continued Entered by CBELL1 - Some minor track out to be noted. My only concern at this time is along the north property line where dirt is piled up against the waddle and the side elevation is higher than the existing grade. Protect newly installed catch basins
02/06/2019 SITE - Stormwater Follow-up BBENEDON Continued Entered by CBELL1 - the site is closed due to rate activity there are no issues at this time
01/11/2019 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME, TRACK OUT NOTED BUT MINOR ONLY.
01/16/2019 SITE - Stormwater Follow-up bbenedo1 Continued Entered by BBENEDO1 - Minor trackout noted. Grading site, not site is higher than grade on silverlake, need to pay attention to potential pour off. waddle in place
12/31/2018 SITE - Stormwater Follow-up BBENEDON Continued Entered by CBELL1 - Miner track out and present on Findaca Boulevard. Schedule inspections for your DP permit every two weeks. Schedule a pre-construction meeting if you have not yet done so