Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 06/05/2020 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by RSALDAT1 - |
| 06/05/2020 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by RSALDAT1 - |
| 06/05/2020 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by RSALDAT1 - |
| 03/13/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by SFLORES2 - |
| 02/25/2020 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DMERANZ1 - OK TO POUR CONCRETE AS NEEDED. I WALKED THE SITE WITH SITE SUPERVISOR AND LOOKED OVER THE SITE FOR THE FUTURE CONCRETE POURS. I HAVE ASKED THAT THEY CONTACT THE ENGINEER OF RECORD AND VERIFY FROM THE ENGINEER OF RECORD FOR THE USE OF HANDRAILS ON RAMPS AND STAIR FOR THIS SITE. SOME OF THE AREAS HAVE HANDRAIL INSTALLED ON ONLY ONE SIDE OF THE RAMP, OR NOTHING INSTALLED AT THIS TIME. THEY WILL VERIFY THE REQUIREMENTS BEFORE ANYTHING ELSE IS POURED SO THEY CAN BLOCK OUT ARAS OR PLAN ON CORING AFTER THE CONCRETE HAS HARDENDED. |
| 02/05/2020 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Storm water trough drains installed in courtyard. |
| 02/04/2020 |
ENGR Grading Final |
DROBERTS |
Not ready for Inspection |
Entered by DMERANZ1 - THE CONTRACTOR HAS COMPLETED THE VERTICAL WORK AT THIS TIME AND WILL BE WORKING ON THE SITE WORK. CURRENTLY THEY ARE WORKING ON THE UNDERGROUND UTILITIES, AND HAVE ROUGHLY CUT THE WATER HARVESTING BASINS. THEY WILL BE LOOKING FOR THE TCO IN THE NEAR FUTURE. I HAVE ADVISED MORRISEY THAT THER ARE GOING TO BE SOME ISSUES WIT THE EXISTING DRAINAGE THAT WILL BE DUMPING ONTO THE PEDESTRIAN ACCESS POINT IN THE NORTH WEST CORNER OF THE EXISTING BUILDING. THEY WILL TRY TO ADDRESS THIS ISSUE IN THE MANAGEMENT MEETING TODAY, THEY WILL LET US KNOW THE SOLUTION DURING THE NEXT SCHEDULED SITE VISIT. |
| 06/05/2020 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by RSALDAT1 - |
| 11/29/2019 |
ENGR Grading Final |
DROBERTS |
Not ready for Inspection |
Entered by DMERANZ1 - THE BUILDING ADDITION IS ALMOST COMPLETE AT THIS TIME, CREWS WORKING ON EXTERIOR STUCCO AT THIS TIME. |