Permit: DP18-0258

Parcel: 117145310


Addresses:

450 S MEYER AV

Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
06/25/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - continued. Bryan with Desert earth at307-4459 Minor track out noted. Work being done in the right of way. Stormwater protections could use to be contained and strengthened.
04/20/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Builder is doing work within the right of way on all three sides of this site. Contractor is also constructing buildings within the site.
02/10/2020 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Construction is underway. Underground sewer piping has been installed and covered. There are material stock piles on site. Please schedule a preconstruction meeting. Superintendent is not on site at this time. Brian at 307-4459 with Miramonte
01/09/2020 ENGR Grading Final DROBERTS Continued Entered by DMERANZ1 - CURRENTLY THE CONTRACTOR IS WORKING ON GENERAL GRADING THROUGHOUT THE SITE FOR LANDSCAPING, AND HAS CONSTRUCTED THE BUILDING SLABS FOR UNITS 1 & 2 AT THIS TIME.
08/21/2019 ENGR Grading Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - No activity at this time.
08/03/2021 ENGR Grading Final MHERNANDEZ Continued Entered by RSALDAT1 - CN
05/20/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 -
09/09/2020 ENGR Grading Final BBENEDON Continued Entered by JSCHNEI2 - Continued. Contractor has north driveway completed and has completed most of the work within the right of way and has removed the street closure barricades.
08/20/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Contractor installing private roadway and curbs and sidewalks in the right of way.
07/23/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Grading, utility work and work within the right of way in progress. Material stock piles on site.
06/01/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Drainage scupper installed Without rebar inspection. Working right away requires right away inspection.
03/12/2020 ENGR Grading Final BBENEDON Continued Entered by SFLORES2 - There are many piles of material on site. There are two houses under construction at this time utilities have been installed.