Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP18-0258
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
06/25/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - continued. Bryan with Desert earth at307-4459 Minor track out noted. Work being done in the right of way. Stormwater protections could use to be contained and strengthened. |
04/20/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Builder is doing work within the right of way on all three sides of this site. Contractor is also constructing buildings within the site. |
02/10/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Construction is underway. Underground sewer piping has been installed and covered. There are material stock piles on site. Please schedule a preconstruction meeting. Superintendent is not on site at this time. Brian at 307-4459 with Miramonte |
01/09/2020 | ENGR Grading Final | DROBERTS | Continued | Entered by DMERANZ1 - CURRENTLY THE CONTRACTOR IS WORKING ON GENERAL GRADING THROUGHOUT THE SITE FOR LANDSCAPING, AND HAS CONSTRUCTED THE BUILDING SLABS FOR UNITS 1 & 2 AT THIS TIME. |
08/21/2019 | ENGR Grading Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - No activity at this time. |
08/03/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by RSALDAT1 - CN |
05/20/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - |
09/09/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by JSCHNEI2 - Continued. Contractor has north driveway completed and has completed most of the work within the right of way and has removed the street closure barricades. |
08/20/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Contractor installing private roadway and curbs and sidewalks in the right of way. |
07/23/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Grading, utility work and work within the right of way in progress. Material stock piles on site. |
06/01/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Drainage scupper installed Without rebar inspection. Working right away requires right away inspection. |
03/12/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by SFLORES2 - There are many piles of material on site. There are two houses under construction at this time utilities have been installed. |